My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank#16 was patched usinfke Epoxy and Fiber Glass Mat methoo coat of Epoxy was applied <br /> to the area of the holes larger than the mat dimensions . The Fiber Glass Mat was pressed in to the <br /> first coat of Epoxy directly after the first coat was applied.A second coat of Epoxy was applied over <br /> the Fiber Glass Mat and overlapped up the sides of the tank. This patch was allowed to cure before <br /> the final lining was applied to the inside of the tank. <br /> EPDXY LINING <br /> The Epoxy lining was applied by the spray method. This author reviewed the Contractors lining <br /> methods of mixing and application of the Epoxy lining and found them to meet the requirements of <br /> the San Joaquin County Environmental Health Department(ED)letter of January 5,2011,under <br /> the hand of Kasey Foley, program director, and the standards of the industry. After the lining was <br /> cured,this author inspected the lining and found that it met the above stated requirements. <br /> COMPLETION <br /> The lining was tested by the prescribed method in the ED letter and is ready for final leak testing. <br /> After testing the tanks may be returned to service as a Underground Storage Tank. <br /> Any questions on this report should be directed to the under signed at(209)368-9381. <br /> Respectfully submitted, <br /> Foothill Engine* v�o -sif <br /> "IF <br /> trvin R e urg, <br /> sT I V I <br /> %N,41 <br /> OF <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.