Laserfiche WebLink
SWRCB,January 2002 0 0 Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present,but were Not Tested <br /> Test Method Developed By: 0 Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure 0 Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Fill Sump#5 Fill Sump# Fill Sump# Fill Sump# <br /> Sum Diameter: 42" <br /> Sum De the 44" <br /> Height from Tank Top to Top of No Piping <br /> Hi hest Pi ing Penetration: Penetrations <br /> Height from Tank Top to Lowest 14" <br /> Electrical Penetration: <br /> Condition of sump prior to Dry <br /> testing: <br /> Portion of Sump Tested Water Line 16" <br /> Sump Material: Fiberglass <br /> Wait time between applying 5 Minutes <br /> water and starting test: <br /> Test Start Time: 12:40 <br /> Initial Reading(RI): .001 <br /> Test End Time: 1:10 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change in Reading(RF-Rj): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> „_flFai145V ... . . 1Pas C3ail ,..... .a.. . Pass ❑Fail <br /> Test Resulf;, ” ,r= Xxpass CJ Fail <br />