My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> SiVRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard 0 Professional Engineer <br /> C Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> owl Spill Box# Spill Box# Spill Box# <br /> Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test'Result: t Past z Cl 1�all „' '°CI5$ ❑]Fail !' Piss Ll Fait 0 Pass 0 Fail <br /> K..,.. .. .. ....5,,. . . , <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Spill/Overfill boxes tested annually with Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.