Laserfiche WebLink
UST SYSTEM PRINTSET INFORMATION <br />1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />2. Plans drawn to scale in non-eresabie print. <br />3. Plot plan to show location and number of tanks. <br />4. Tank cross-sectional diagram included on prints submitted. <br />5. Detail of tank, piping system, excavation and cover. <br />6. s Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />7. verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br />9. Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br />11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />17 T®wr rY1ffffCTTTnr <br />TANK # # # <br /># <br /># # <br />CAPACITY <br />MANUFACTURER <br />COMPOSITION <br />MODEL <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). (Section 2635 (b) C4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />® (1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />® (3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />