Laserfiche WebLink
i 0 <br />E. Other types of to <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection systems (detail drawing of spill catchment basins)/piping sump(s) required, including tank fill and all <br />openings). [Section 2635 (b) (8)] <br />A. Spill catchment basin. <br />® Capacity: <br />Type: <br />B. Manual monitoring (motor vehicle fuels only). <br />(1) {Written filling procedure: [Section 2635 (9) (A) (B) (C)] <br />(a) Tank volume capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tank capacity <br />determined immediatety prior to filling. <br />C. Mechanical/Electronic monitoring (mandatory for non -motor vehicle fuel tanks) [Section 2635 (8) (A) (B) (C)] <br />(1) Level sensing device and #2 or #3 below. <br />(2) Audible/visual alarm triggered by a liquid level sensor. <br />(3) Automatic shut-off. <br />15. Doubte-walled tank and system allow for monitoring of the annular space. <br />[Section 2635 (8) (A) (B) (C)] <br />A. Release from 10 container designed to drain to a specific location within the annular space to be detected by <br />a monitoring device or method. <br />B. Continuous electronic monitoring corrected to audible/visual alarm system. <br />C. Type of Detectors (Detail of monitoring equipment as installed). <br />(1) Brand <br />(2) Model r• <br />(3) Sensor Type: Vapor _ Liquid both. <br />(4) Sensor Specification. <br />(5) Brochures provided. <br />(6) Manufacturer's written installation instructions. <br />(7) Location of probe for: <br />(tank): (piping): <br />16. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or double- <br />wall UST. [Section 2631 (r)] <br />A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the 10 tank or double waited UST. <br />17. Tanks subject to floatation. [Section 2631 (s)] <br />A. Anchored by deadman or stab. <br />B. Anchors to be installed as specified by manufacturer. <br />C. Installation details provided on plans. <br />D. Calculations provided. <br />18. Fiber liners between tank(s) and excavation to prevent infiltration of native soil into backfill material. <br />5 <br />