Laserfiche WebLink
INSTALLATIONNEW UST INSPECTION ' (i: <br />AEL <br />FACILITY . <br />0 <br />4. <br />5. <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUUM: /len ,S -- ti PSI: HRS IN' P,,p <br />PRIMARY TANK TEST: PSI: <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/MIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />®� <br />A <br />I <br />6. <br />PRIMARY PIPING TEST CNINIMUN 40 PSI/30 MIN) * / A5 / r �,® h t <br />P <br />MALL <br />TANKS TO BE INSTALLED AND TESTED IM ACCORDANCE <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />014. <br />R <br />T <br />8. <br />LAKE TEST ON ALL SLIPS (24 BR. MINIMUM) HRS: Z <br />0 <br />I <br />(CCR 2635 (B) (5)) <br />V <br />A <br />(CCR 2635) <br />(CCR 2635 (B) (6)) <br />E <br />L <br />0. <br />OVERSPILL PERFORMANCE TEST <br />D <br />S <br />( <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />t 19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />7/zr_ <br />�s <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />Z,//c� 9 <br />✓ <br />v <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />0 <br />4. <br />5. <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUUM: /len ,S -- ti PSI: HRS IN' P,,p <br />PRIMARY TANK TEST: PSI: <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/MIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />®� <br />12. <br />6. <br />PRIMARY PIPING TEST CNINIMUN 40 PSI/30 MIN) * / A5 / r �,® h t <br />(CCR 2635 (B) (4)) <br />( / <br />V <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI:_S NR IN- ' OTHER: <br />(CCR 2635 (A) (4)) <br />014. <br />PERFORMANCE TEST OF LIME LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />8. <br />LAKE TEST ON ALL SLIPS (24 BR. MINIMUM) HRS: Z <br />(CCR 2635 (A)) <br />PERFORMANCE TEST OF AUTOMATIC PIMP SYSTEM SHUT-OFF <br />(CCR 2635 (B) (5)) <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(CCR 2635) <br />(CCR 2635 (B) (6)) <br />d <br />0. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (A) (4)) <br />I� <br />( <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />FINAL INSPECTION <br />EH234)06 3/92 (REVISED 11\92) <br />93 <br />12. <br />PERFORMANCE TEST FOR -ALL- MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />y <br />f 13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />014. <br />PERFORMANCE TEST OF LIME LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />® 15. <br />PERFORMANCE TEST OF AUTOMATIC PIMP SYSTEM SHUT-OFF <br />(CCR 2635 (B) (5)) <br />( 16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />d <br />( 17. <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR 2635 (E) (2)) <br />f 18. <br />TANK ACCESS PORTS SMUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />/�� <br />✓ <br />t 19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN. REPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />v <br />21. <br />"C- FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />r 22. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />23. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S CODE 25284 (E) (F)) <br />EH234)06 3/92 (REVISED 11\92) <br />93 <br />