Laserfiche WebLink
NEW U a •' INSPECTION <br />ALL TANKS TO BE ar AND TESTED IN ACCORDANCE <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />oil! <br />DATE <br />t 6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 NIM) 1j®� ® 2D�y <br />ITEM OR EQUIPMENT INSPECTED <br />(CCR 2632 (C) (2)) <br />q <br />® 7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: HR OTHER: <br />1. <br />UST PUNS SUBMITTED/ FEES PAID <br />(H+S CODE 25287, CCR 2635 (D) (8) <br />`�+� <br />✓ <br />(CCR 2635 (A)) <br />2. <br />UST INSTALLATION PLANS APPROVED <br />(CCR 2635 (E) (5)) <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(CCR 2635) <br />INITIAL INSPECTIONS <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />'S/? <br />/ <br />3. <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />HOLIDAY: <br />ALL PIPING AND FITTINGS ION PROTECTED <br />(CCR 2635 (B)) <br />VACUUM: /Gfiaq� OAp: PSI: HRSjep 3i> <br />BRINE(LIQUID ): OTHER: <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />4- <br />PRIMARY TANK TEST: PSI: <br />HRS/MIM: <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 CD) (5)) <br />5- <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />( 2635 (A) (3) (4) (6)/ API/PEI) <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />PIPING INSPECTIONS <br />- <br />®Ti ®,% <br />t 6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 NIM) 1j®� ® 2D�y <br />(CCR 2635 (B) (4)) <br />(CCR 2632 (C) (2)) <br />q <br />® 7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: HR OTHER: <br />(CCR 2635 CA) (4)) <br />PERFORMANCE TEST OF CONT INUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />8. <br />LAKE TEST ON ALL SUMPS (24 MR. MINIMUM) lits: <br />(CCR 2635 (A)) <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />9- <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(CCR 2635) <br />15- <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />OVERSPILL PERF TEST <br />(CCR 2635 (A) (4)) <br />!.f l/Zi1O. <br />o` <br />01-111. <br />ALL PIPING AND FITTINGS ION PROTECTED <br />(CCR 2635 (B)) <br />FINAL INSPECTION <br />COMMENTS: -v <br />EH23-M 3/92 (REVISED 11\92) <br />m <br />12- <br />PERFORMANCE TEST FOR •ALL• MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />q <br />/ <br />!✓� <br />`fi( <br />13- <br />PERFORMANCE TEST OF CONT INUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />a S Z <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />15- <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2635 (B) (5)) <br />o` <br />16. <br />BALL FLOAT VALUES INSTALLED <br />(CCR 2635 (B) (6)) <br />/mss 17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />8. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 CD) (5)) <br />0-(19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />- <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />21. <br />'C• FORA COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />f <br />22. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />23. <br />ALL CONDITIONS MET; FACILITY PERMIT 1 <br />(H -S CODE 25284 (E) (F)) <br />COMMENTS: -v <br />EH23-M 3/92 (REVISED 11\92) <br />m <br />