My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:15:47 PM
Creation date
6/23/2020 6:46:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Rol' <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> FACILITY NAME Roz. <br /> USA#68151 <br /> FACILITY SITE ADDRESS R03. CITY R04. <br /> 35 N CHEROKEE LANE LODI,CA 95240 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen(i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Com lete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Waste Hauler R10. CALIFORNIA HAZARDOUS WASTE R20. 24/7 R30. <br /> R11. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33. <br /> R14, R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME: Rao. TITLE R50. <br /> GRACE KELLER SITE MANAGER 209-369-1525 <br /> NAME R41. TITLE R51. <br /> SANDY EDWARDS HEALTH AND SAFETY COMPLIANCE COORDINATOR <br /> NAME Raz. TITLE R52. <br /> NAME R43. TITLE R53. <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R60. <br /> hwfwrc-e(06/03)-1/1 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.