August 6, 2008
<br />Jim Damitz
<br />Able Maintenance
<br />3224 Regional Pkwy.
<br />Santa Rosa, CA 95403
<br />Fax: (707) 545-5515
<br />RE: USA Gasoline 35 N. Cherokee Ln., Lodi CA (SR0054656)
<br />The San Joaquin County Environmental Health Department (EHD) has completed the review of
<br />the permit application to perform an ISD/EVR phase II upgrade, cold start. The permit has been
<br />approved with the following conditions.
<br />Conditions of approval:
<br />1. Contact the local fire department, local planning or building department and the San
<br />Joaquin Valley Air Pollution Control District for any applicable permits.
<br />2. Any changes shall be submitted to the San Joaquin County Environmental Health
<br />Department (EHD) for approval prior to commencing work. All new addenda supercede
<br />the previous ones.
<br />3. All components must be certified by an independent testing organization and labeled as
<br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See California Code of
<br />Regulations (CCR), Title 23 Chapter 16 Table B for complete list). The component must
<br />bear the appropriate mark as required by the independent testing organization.
<br />4. Before the alarm history is cleared by the "cold start", a current printout must be
<br />created and available for EHD inspection. Inspection may occur during the monitoring
<br />system functionality test.
<br />5. Qualified service technicians must possess or work under the direct and personal
<br />supervision of an individual physically present at the work site who possesses all of the
<br />following:
<br />a. One of several permissible valid, current contractor's licenses issued by the
<br />Contractors State License Board (may be issued to the installation company), and
<br />b. All valid, current California UST certificates issued by the International Code
<br />Council (ICC), that are applicable to the work being performed, and
<br />c. A valid, current certificate of training from the manufacturer(s) of the
<br />component(s) being tested, repaired, or serviced;
<br />d. Each person installing or testing any component must hold a certificate of
<br />training from the manufacturer of that component.
<br />Page 1 of 2
<br />0 •
<br />San Joaquin County
<br />DIRECTOR
<br />•.'cp
<br />Environmental Health Department
<br />Donna Hera RENS
<br />�O''_.�
<br />A
<br />ASSISTANT DIRECTOR
<br />600 East Main Street
<br />Laurie Cotulla, REHS
<br />Stockton, California 95202-3029
<br />PROGRAM COORDINATORS
<br />•'
<br />Carl Borgman, REHS
<br />cq�/Fp•R�`P
<br />Website: www.s ov.or /ehd
<br />%g g
<br />Mike Huggins, REHS, RDI
<br />Margaret Lagorio, REHS
<br />Phone: (209) 468-3420
<br />Robert McClellon, REHS
<br />Fax: (209) 464-0138
<br />,teff Carruesco, REHS, RDI
<br />Kasey Foley, REHS
<br />August 6, 2008
<br />Jim Damitz
<br />Able Maintenance
<br />3224 Regional Pkwy.
<br />Santa Rosa, CA 95403
<br />Fax: (707) 545-5515
<br />RE: USA Gasoline 35 N. Cherokee Ln., Lodi CA (SR0054656)
<br />The San Joaquin County Environmental Health Department (EHD) has completed the review of
<br />the permit application to perform an ISD/EVR phase II upgrade, cold start. The permit has been
<br />approved with the following conditions.
<br />Conditions of approval:
<br />1. Contact the local fire department, local planning or building department and the San
<br />Joaquin Valley Air Pollution Control District for any applicable permits.
<br />2. Any changes shall be submitted to the San Joaquin County Environmental Health
<br />Department (EHD) for approval prior to commencing work. All new addenda supercede
<br />the previous ones.
<br />3. All components must be certified by an independent testing organization and labeled as
<br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See California Code of
<br />Regulations (CCR), Title 23 Chapter 16 Table B for complete list). The component must
<br />bear the appropriate mark as required by the independent testing organization.
<br />4. Before the alarm history is cleared by the "cold start", a current printout must be
<br />created and available for EHD inspection. Inspection may occur during the monitoring
<br />system functionality test.
<br />5. Qualified service technicians must possess or work under the direct and personal
<br />supervision of an individual physically present at the work site who possesses all of the
<br />following:
<br />a. One of several permissible valid, current contractor's licenses issued by the
<br />Contractors State License Board (may be issued to the installation company), and
<br />b. All valid, current California UST certificates issued by the International Code
<br />Council (ICC), that are applicable to the work being performed, and
<br />c. A valid, current certificate of training from the manufacturer(s) of the
<br />component(s) being tested, repaired, or serviced;
<br />d. Each person installing or testing any component must hold a certificate of
<br />training from the manufacturer of that component.
<br />Page 1 of 2