My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:15:47 PM
Creation date
6/23/2020 6:46:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
192& <br />RE: USA'Gasoline 35 N. Cherokee Ln., Lodi CA (S 054656) <br />6. Contact Aris Cacapit (468-3453) to arrange the following inspection(s) (a 48-hour notice <br />is required): <br />a. The EHD must witness the functionality of the monitoring system to ensure that <br />monitoring has been restored to meet the requirements of California Code of <br />Regulations Title 23 and the Health & Safety Code. <br />7. If concrete is being broken near the UST or piping, pipeline and or tank integrity testing <br />must be performed by a SWRCB licensed tank tester in accordance with the <br />manufacturer's guidelines. Results must be received by the EHD within seven days of <br />returning the facility to operating condition. <br />8. If electrical penetration is added to UDC, a 24 hour lake test or its equivalent will be <br />required to be witnessed by this office. <br />9. An "Underground Storage Tank Certification of Installation/Modification" form (form Q <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] before <br />this upgrade will be considered complete by EHD. <br />10. Permit expires 180 days from date of approval. If an extension to the expiration date is <br />required, a written request must be submitted to the EHD prior to the expiration date. <br />Thank you, <br />c <br />Aris Cacapit, EHS <br />Environmental Health Specialist <br />600 E. Main St. <br />Stockton, CA 95202 <br />(209) 468-3453 <br />acacapit@sjcehd.com <br />WORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.