Laserfiche WebLink
Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional. Engineer <br />❑ Other (Spec) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Piping Run # 87 Piping Run # 91 <br />Piping Material: Poly Poly <br />Equipment Resolution: 0.5% of span <br />Piping Run # Diesel <br />Poly <br />Piping Manufacturer: <br />Smith Smith <br />Smith <br />Piping Diameter: <br />3" 3" <br />Y <br />Length of Piping Run: <br />100' 100, <br />100, <br />Product Stored: <br />Gasoline Gasoline <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Reducer boots/fittings Reducer boots/fittings <br />Reducer boots/fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes 10 minutes <br />10 minutes <br />Test Start Time: <br />10:00 am 10:00 am <br />10:00 am <br />Initial Reading (RI): <br />5 psi. 5 psi <br />5 psi. <br />Test End Time: <br />11:00 am 11:00 am <br />11:00 am <br />Final Reading (.RF): <br />5 psi 5 psi <br />5 psi <br />Test Duration: <br />I hour 1 hour <br />I hour <br />Change in Reading (RF -R,): <br />None None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable loss No detectable loss <br />No detectable loss <br />Test Result: <br />® Pass 0 Fail 0 Pass 0 Pail <br />© Pass D Fail <br />Comments — (include /nformation on repairs made prior to testing, and recommended follow-up for failed tests) <br />