My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tesoro #68151 <br />35 N. Cherokee Lane <br />Lodi, CA 95240 <br />Revised Scope of Work <br />A) Contractor to remove remaining product from midgrade (89) UST. Recoverable product maybe <br />pumped into the regular (87) UST. Transfer premium (91) product to former midgrade (89) UST. Rinse <br />former premium (91) UST prior to conversion to diesel. <br />B) Remove dispensers. Retain EVR Phase II and ISD equipment for re -use. Dispose of dispensers as <br />directed by owner. UDC's to remain. <br />C) Remove from scope of work. <br />D) Remove Phase I vapor recovery equipment from premium (91) tank. <br />E) Cap premium (91) vapor return piping. <br />F) De -manifold vent risers. Install PV vent caps as required by Air Board. <br />G) Diesel fill port equipment already in place. Remove vapor adapter and cap vapor riser with 4" <br />galvanized cap. Verify isolation of converted tank from remaining gasoline tanks. <br />H) Install Gilbarco Encore 5005 3+1 (Typ, of 4) blending dispensers. Contractor to install dispenser <br />mounting adapter/shield as required. <br />1) All EVR Phase II and ISD equipment pre-existing. <br />J) Remove from scope of work. <br />K) Re -program POS to include diesel sales. <br />L) Remove from scope of work. <br />OV 0 6 • ? <br />41 <br />ASV JC3R UUN C OUW',g. <br />EhlVlRONMENTAL. <br />HEALTH DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.