My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIW-09-2011 08:09 Service Station Systems 408 938 8888 P.05 <br />5. _PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard Q Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: Q Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />STP Sump # 91 <br />Sump Diameter: <br />42" <br />Sump Depth: <br />61" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />12" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />24" <br />Condition of sump prior to testing: <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and w!!!1 2?. <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown? <br />[3 Yes p No ® NA <br />Was fail-safe verified to be <br />operational?* <br />O Yes I] No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 minutes <br />Test Start Time: <br />12:40 pm <br />Initial Reading (R,): <br />2.9415 <br />Test End Time: <br />12:55 pm <br />Final Reading (RF): <br />2.9407 <br />Test Duration: <br />15 min <br />Change in heading (RF -R,): <br />-0.0008 <br />Pass/Fall Threshold or Criteria: <br />+/-0.002" <br />Test Result: <br />® Pass 0 Fail <br />Was sensor removed for testing? <br />OYes q No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />®Yes p No p NA <br />Comments -- (include information on repairs made prior to testing, and recommended follow-up or ailed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Replaced tom test boot to 91 line in 91 STP sump <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />TOTAL P.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.