Laserfiche WebLink
'oPqu I,N, o0 <br />SAN JOAQUIN COUNTY is <br />a err— ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />`P Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />cet <br />q�iiio <br />Facility Name: <br />u. f <br />Inspection/Date: <br />1 <br />❑ <br />❑ mechanical Model: <br />e <br />Facility Addre : <br />cA qvQ <br />Service Request #: <br />�ox&v <br />Onsite Service Technician's Name: <br />tfifa <br />Leak detector <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />g <br />..1 ❑ <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />SERVICE <br />u. f <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />e <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />..1 ❑ <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />9 <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />u. f <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />e <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />EHD <br />—��IIW= <br />❑ Caldwell System ❑ Other <br />..1 ❑ <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />9 <br />Testing for the above components are next due by: <br />o4 46 due- 45 Awki <br />- <br />Note: lease be aware that 21 containment components are required to be test upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />ra MA l. -v. _�. <br />u. f <br />MAN, <br />e <br />EHD <br />—��IIW= <br />• i�. <br />i <br />..1 ❑ <br />EHD 23-04 <br />Rev 10/06/10 <br />UST SERVICE REQUEST INSPECTION REPORT <br />