Laserfiche WebLink
FEB -25-2011 15:47 Service Station Systems <br />40 <br />408 938 8888 P.05 <br />'fest Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: N Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />MINERNIMMEM <br />Piping Run # 87 Piping Run # 89 Piping Run # 91 <br />Piping Material: Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: <br />Smith <br />Snaith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />100' <br />100' <br />Product Stored: <br />Gasoline_ <br />Gasoline <br />Gasoline <br />Method and location of <br />piping -Tun isolation: <br />Reducer Boots/Fittings <br />Reducer Bootsmittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />10:00 am <br />10:00 am <br />Initial Reading (R,): <br />5 psi <br />5 psi <br />Test End Time: <br />11;00 am <br />11:00 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />t hour <br />Change in Reading (RF -R,): <br />None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />No Detectable Loss <br />Test Result: <br />® Pass ❑ Fail <br />91 Pass ❑ Fail <br />❑ Pass M Fail <br />Comments — (include !n or,nation on repairs made prior to testing, and recommended follow-upforfaidecl tests) <br />91 line visual fail. Need new test boot <br />3.5 x 2.4 split test boot <br />