Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — tPaS 2 of 22 <br />Vt. UNDERDISPENSER CONTAINMENT (tJDC) MONITORING <br />that <br />awl <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />El 1. CON'l INUOUS ELECTRONIC MONITORING X 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />496-54a <br />T. NO DISPENSERS El 99, OTHER (Specify) <br />4W)-54b <br />LEAK MONITOR MANUFACTURER: MODEL <br />LEAK SENSOR MANUFACTURER: 4'30.57 MODFI.4 #(S): <br />490-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. If a. YES X b. No <br />41111-11) <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN, 0 a. YES X b. NO <br />"""f) <br />FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SI IUTDOWN. [I a. YES X b. No <br />490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. X a. YES [3 b. NO <br />UDC CONSTRUCTION IS: X 1, SINGLE WALL 0 2. DOUBLE WALL <br />490-63 <br />tL_DOUBLE At_kLL: <br />490.64. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: Ela. LIQUID b. PRESSURE ❑ c. VACUUM <br />A LEAK wiTHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 0 a. YES 0 K NO <br />1110-0b <br />VII. PERIODIC SYSTEM TESTING <br />-rFsTiNG <br />❑ I. FED FRE FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANM <br />490-65 <br />LEA11 <br />. . ... LLA&zjQjLFj1'LLLL1j102UjLM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REgUIRED, <br />2 SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />440-66 <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />4'XJ-67 <br />VIII. RECORD KEEPING <br />' <br />The following nionitoring/maintenance records are kept for this facility: <br />4W-68 <br />0 a. ALARM LOGS El b. VISUAL INSPECTION RECORDS 0 c. TANK INTEGRITY TESTING RESULTS <br />[I d_SIR TESTING RESULTS (and supporting documentation records) ❑ c. TANK GAUGING RESULTS (and supporting documentation records) <br />0 f ATG TESTING RESULTS (and supporting documentation records) ❑ g, CORROSION PROTECTION 60-DAY LOGS <br />0 h, EQUIPMENT IPMENT MAINTE NANCE AND CALIBRATION RECORDS <br />IX TRAINING <br />0 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />REFERENCE UMENTS MAINTAINED AT FACILITY (Check at! that apply,) <br />0 THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490_69b <br />0 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-60c <br />C3 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-64d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br />490-6911 <br />s rATIS I ICAL INVENTORY ' NTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />4q0-699 <br />❑ OTHER (Specify)- <br />490-696 <br />490_69i <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />4110-70 <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days ofhire. "Chis training will include, but is not limited to, the following: <br />> Operation of the UST systems in a manner consistent with the facility's best management practices. <br />v The facility employee's role with regard to the monitoring equipment as specified in this us,r Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />Name(s) of contact person(s) for emergencies and monitoring alums. <br />X COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490-_71 <br />Mechanical overfill <br />X1. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: L) the daily/routine UST monitoring activities and maintenance of LIST leak detection equipment covered <br />by this plan occurs; 2.) all conditions that indicate a possible release are investigated: and 3.) all monitoring. records are maintained properly <br />-THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE <br />NAME: Grace Keller 490,72 TITLE: <br />490-73 <br />NAME: Sandy Edwards 490-74 TITLE: Environmental Compliance Admin. <br />49()-75 <br />*The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action, <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE — <br />C2, <br />C'' jot <br />DATE! <br />490-77 <br />��c� <br />2/8/2010 <br />REPRESUNI INC, X I Tank 0.nW() �4�0.76f <br />UPCIF UST -D (12/2007) - 315 www.unidocs.org <br />