My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — (Page 2 of 2) <br />(Checkall <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />thataDol- <br />UDCNIONIFORINO IS PERFORMED USING THE FOLLOWING METHODS) <br />❑ I C-ON-11,N't.,IOUSELECTRONIC MONi-rORIN() X 2. FLOAT AND CHAIN ASSEMBLY 0 3. F1I,EcTRONIC STAND-ALONE <br />0 4, NO DISPENSERS ❑ 99. OTHER (Specify) <br />LEAK MONITOR MANUFACTURER' 4')0-55 MODEL #: <br />4461i6 <br />LEAK SENSOR MANUFACTURER: 400-0 MODEL #(S): <br />41)0 -ss <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 0 a. Y FS X b. NO <br />UDC LEAK ALARM -TRIGGERS AUTOMATIC PUMP siLuTDOWN. 0 a. YES X b, NO <br />FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTIX)WN. 0 a. YES X b. NO <br />490-61 <br />UDC MONITORING STOPSTHE FLOW OF PRODUCT AT THE DISPENSER. X a. YES 0 b, No <br />UDC CONSTRUCTION IS: X 1, SINGLE WALL 0 2, DOUBLE WALL <br />II DOUBLE WALL: <br />49(t -64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 a. LIQUID 0 b. PRESSURE 0 c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 0 a. YES 0 b. NO <br />4AL64b <br />VII. PERIODIC SYSTEM TESTING <br />0 1 ELD TESTING:"PHIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT EN'HAN __( J -_f <br />) <br />4904,5 <br />LEAK Ik,--,TELTIQN LI) MUS PERFORMED. PERIODIC ELDIS PERFORMED EVERY 36 MONTHS AS REQUIRED. f2-3CCR s--644 11 <br />(L <br />2. SECONDARY CONTAINMENT COMPONENTS -ARE TESTED EVERY 36 MONTHS. <br />490-60, <br />1 SPILL BUCKETS ARF 'TESTED ANNUALLY, <br />41)0,67 <br />VIII, RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility <br />49n,68 <br />0 a AI ARM LOGS 0 b. VISUAL INSPECTION RECORDS 0 c.TANK IN-rECRI'FY-TESTING RESULTS <br />0 d. SIRTESTING RESULTS (and supporting documentation records) 0 e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f, AICs TES TING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY I,O(',iS <br />h- FQUIPMFNT MAINTENANCE AND CALIBRATION RECORDS <br />IX TRAINING <br />Z Personnel with usi monitoring responsibilities are familiar with all of the following documents relevant to their job done,,;: <br />4W-69. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that appli,) <br />0 THIS UNDERGROUNDSTORAGE TANK MONITORING PLAN (Required) <br />49CW58b i <br />El OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69� 1 <br />El CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d <br />El CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490,b,)e <br />0 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: -HANDBOOK FOR TANK OWNERS MANUAL AND <br />490-69f <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION. "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS - <br />490-6,)g <br />C3 OTIIER (Speclfv): <br />490�6400-0h <br />9i <br />"Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />This facilitv has a "Desi <br />W,, <br />4 -70 <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />Operation of the LIST systems in a manner consistent with the facility's best management practices. <br />The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />Name(s) of contact person(s) for emergencies and monitoring alarms. <br />X COMMENTSIADDITtONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan, <br />490-71 <br />I® PERSONNEL RESPONSIBILITIES <br />The USTOwncr/Operator is responsible for ensuring that. 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />,byjIns plan occum, �p sible release are i ves�ga!eiq- maintained e _properly, <br />THE FOLLOWING PERSON(S) ARE REErySPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: Grace Keller 490-72 TITLE: Manager <br />490-73 <br />NAME: Sandy Edwards 4"-74 TITLE: Environmental Compliance Admin. <br />49* -75 <br />The Designated EST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator <br />of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATORSIGNATURE <br />CERTIFICATION: I certify that the informationprovided herein is true and accurate to the best of my knowledge. <br />—11�- <br />APPLICANT SIGNATURF(---, <br />DATE: <br />71 <br />2/8/2010 <br />REPRESENTING X I T�O.ner. Oper ator 0 2 Facilliv 0.,ne,,'Operato, 3_ Authorized Regre—Wi,e of0— 490.76. <br />I <br />UPCF us,r-D (1212007) - 315 ww-w.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.