Laserfiche WebLink
6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer E Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum E Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />STP Sump # 87 <br />STP Sump # 91 <br />42" <br />STP Sump # Diesel <br />42" <br />Sump Diameter: <br />42" <br />Sump Depth: <br />68" <br />68" <br />61" <br />+ <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />24" <br />12" <br />12" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />12" <br />12" <br />24" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No E NA <br />❑ Yes ❑ No E NA <br />❑ Yes ❑ No E NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />® Yes ❑ No E NA <br />❑ Yes ❑ No E NA <br />❑ Yes ❑ No E NA <br />Was fail-safe verified to be <br />o erationalf <br />® Yes ❑ No ® NA <br />❑ Yes ❑ No E NA <br />❑ Yes ❑ No E NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />9:44 am <br />10:11 am <br />11:06 am <br />Initial Reading (Rj): <br />3.5240 <br />2.8964 <br />3.0830 <br />Test End Time: <br />9:59 am <br />10:26 am <br />11:21 am <br />Final Reading (RF): <br />3.5240 <br />2.8969 <br />3.0837 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (Rr-Rt): <br />0.0000 <br />0,0005 <br />0.0007 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/-0.002" <br />+/-0.002" <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />El Pass ❑ Fail <br />Was sensor removed for testing? <br />E Yes ❑ No ❑ NA <br />E Yes ❑ No ❑ NA <br />E Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />E Yes ❑ No ❑ NA <br />E Yes ❑ No ❑ NA <br />E Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended fol(ow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />