My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:57:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +(- 0.002" <br />UDC # 1/2 <br />UDC Manufacturer: Bravo <br />UDC # 3/4 <br />Bravo <br />UDC # 5/6 <br />Bravo <br />UDC # 7/8 <br />Bravo <br />UDC Material: <br />Steel <br />Steel <br />Steel <br />Steel <br />UDC Depth: <br />12" <br />12" <br />12" <br />12" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Located on Bottom <br />Located on Bottom <br />Located on Bottom <br />Located on Bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Located on Bottom <br />Located on Bottom <br />Located on Bottom <br />Located on Bottom <br />Condition of UDC prior to <br />testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of UDC Tested <br />2" above piping <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?" <br />safe <br />El ❑ No ® NA <br />1771Yes ❑ No ® NA <br />❑ Yes 171No ® NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No M NA <br />❑ Yes ❑ No ® NA <br />[_-]Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />2:10 pm <br />2:10 pm <br />2:27 pm <br />2:27 pm <br />Initial Reading (Rj): <br />4.6578 <br />4.3287 <br />2.5906 <br />3.2556 <br />Test End Time: <br />2:25 pm <br />2:25 pm <br />2:42 pm <br />2:42 pm <br />Final Reading (RF); <br />4.6570 <br />4.3283 <br />2.5907 <br />3.2558 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (RF -RI): <br />0.0008 <br />0.0004 <br />0.0001 <br />0.0002 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: <br />® Pass ❑ Fail <br />[K Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No to NA <br />❑ Yes ❑ No ® NA <br />Was sensor properly replaced and <br />` verified functional after testing? <br />171Yes ❑ No ® NA <br />❑ Yes El No ® NA <br />[I Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />ENVIRONMENTAL <br />DEPAH. g <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.