Laserfiche WebLink
° <br />~ . <br />0 <br />At the time of the annual tank testing, all leak detection <br />devices will be checked for proper operation. <br />If no annual tank testing is to be performed, them the monitoring <br />system will be checked annually by a trained person employed or <br />hired by the Customer Company. <br />In the case a leak is suspected per the inventory records or one <br />of the monitors indicates a leak, the following procedures will <br />be performed within 24 hours: <br />1. Check inventory records at site and at the main office <br />2. Visual check all dispensers for leaks <br />3. Visual check all turbine pit areas for gasoline <br />4. Stick and check tank secondary containment cavities for <br />gasoline or water <br />5. Check calibration of all dispenser meters <br />If fuel is found in the secondary containment of the turbine pit <br />areas or the secondary tank, the Customer Company will hire e <br />contractor to determine where the fuel is coming from and repair. <br />If a precision tank test is deemed necessary to determine if a <br />leak is existing, then the Customer Company will perform this <br />test with its own personnel or will hire a contractor to perform <br />this test. The contractors at its disposal are: <br />Sacramento Equipment Maint. 916-925-2716 <br />Paradiso Construction 415-562-5511 <br />Becker Industries 707-255-9597 <br />If a leak is found that has released gasoline into the ground, or <br />gasoline is found in the secondary containment areas of the <br />station° the Customer Company will report, within 24 hours, to <br />the local agency responsible for the particular site. If cleanup <br />is necessary, the Customer Company will employ an engineering <br />firm to determine extent of contamination. The Customer Company <br />has several firms at its disposal: <br />Kleinfelder and Assoc. 916-366-1701 <br />Harding -Lawson and Assoc. 415-883-5566 <br />Dames and Moore 209-445-0156 <br />Naprealian Engineering 707-746-6915 <br />The Customer Company will employ the engineering firm to do site <br />evaluation, cleanup proposal, and contact all necessary parties <br />to cleanup site. <br />4 <br />