Laserfiche WebLink
11/18/2008 10:31 9163731173 WALTONENGINEERING PAGE 06 <br /> STEP 7 Apply a bead of Blue Bond 801 around the housing threads <br /> and thread the repair boot onto the housing. <br /> Oili <br /> I <br /> S'T'EP 8 Index the repair boot with the fill tube at the 12:00 position. <br /> STEP 9 Install the split Insert around the pipe And apply a liberal kt <br /> bead of Blue Seal Glue along the sewn and lightly hold or <br /> clamp until cured. <br /> 1 <br /> $TE 10 Install the insert into the repair boot. <br /> S'T'EP 11 install the rear clamp and tighten to 65 inch lbs. (Be careful <br /> not to do this until the Blue :Bond 801 is cured.) Install the <br /> outer clamp loosely so that air can escape between the insert <br /> and the boot while the boot is being filled with Bostik sealant. <br /> ]Fill the entire boot cavity with Bostik 1100PS sealant.As the <br /> boot fills it will begin to pressurize and push the insert <br /> outward. <br /> STEP 12 'Tighten the outer clamp to 6S inch lbs. Clean up any excess " <br /> sealant and allow 24-48 hours for Bostik 110OFS sealant to <br /> felly cure.' t <br /> b • 4 <br /> ',:,ern..;a.:: '•: <br /> .. .d . . . ...... . ..... _... . ,..:....:........- ..G ..a., ..0. <br /> . � ..a. >a �"gym:,:. w'". •'.a•^ ""a.;"°t1��,r.'` '{4;^';,. <br /> .a'.. i '... .1 <br />