My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8 The 115 VAC receptacle shall be located on the wall as shown in <br />Figure III. <br />4.9 Local codes may require that AC power be permanently wired <br />to the EMS console. In this case, the console power would be <br />run as stated above, but the wires would terminate inside the <br />receptacle box with a cover plate. Power will be connected to the <br />console at time of installation. <br />I W14 1:13 <br />5.0 Manway requirements <br />5.1 Review Figures I and Figures IV thru XII for various probe <br />applications. <br />6.1 Review Figures H and III (EMS Conduit Requirements). <br />6.2 The EMS has been designed to use 3/4 inch conduit. <br />6.3 Conduit should be looped from probe to probe as the probes <br />are wired in parallel. <br />6.4 An EYS fitting is required at each end of the conduit between <br />the EMS console and the first probe. <br />6.5 The conduit for the external probes shall have no other wiring, <br />including the EMS in -tank probe cables. <br />6.6 Figure III shows the proper method to route the conduit from <br />the EYS fittings inside the facility to the console location. <br />6.7 Pull strings should be provided for pulling the annular space <br />probe in double wall fiberglass tank whenever possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.