My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 1 <br />4.1 Power requirements: 115 VAC + 10%, 60 HZ. <br />4.2 Current: 0.38 AMPS. <br />4.3 Power consumption: 44 Watts. <br />4.4 Wiring shall meet NFPA 70, National Electrical Code, NFPA <br />Marine and Automotive Requirements. <br />4.5 Ile EMS console requires a dedicated circuit. The definitioFF <br />of a dedicated circuit is: no other equipment shall be powered fro <br />the same circuit breaker in the AC service panel. I <br />4.6 An earth ground must be connected to the neutral bar of the AC <br />service panel which supplies power to the EMS. Local code <br />will supply the definition of a true earth ground and proper method <br />of installation. <br />4.7 There shall be four (4) conductors running from the AC servici-i <br />panel to the receptable. They should be as follows: <br />1) Line (black); from service panel to 115 VAC <br />receptacle line. <br />Neutral (white); from service panel to 115 VAC <br />receptacle neutral. <br />3) lst ground (green); from earth ground to the 115 VAC <br />receptacle ground. <br />4) 2nd ground (green); from earth ground, and leave in <br />the back of the receptacle junction box. This will be <br />connected to the console chassis at installation. <br />NOTE: THE TWO (2) GROUND WIRES ARE A U.L. <br />REQUIREMENT. BOTH GROUNDS MUST ORIGINATE <br />FROM THE SAME POINT. FAILURE TO PROVIDE THE <br />PROPER GROUNDING WILL I1 1DATE ALL IMPLIEY <br />OR EXPRESSED WARRANTIES AND MAY PRESENT A <br />DANGEROUS CONDITION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.