My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( ) yes () no <br />12. What is the specified line pressure during a test? <br />operating pressure of <br />150% of operating pressure <br />specific test pressure of <br />13. What is the minimum waiting period required between a delivery of product to an <br />underground storage tank and the start of the data collection for a pipeline leak detection <br />test? <br />no waiting period <br />( ) less than 15 min <br />( }15 min to1h <br />( )1to5h <br />( )6to12h <br />( )12 to24h <br />( ) greater than 24 h <br />( ) variable (Briefly explain.) <br />14. What is the minimum waiting period required between the last dispensing of product <br />through the pipeline and the start of the data collection for a pipeline leak detection test? <br />(X) no waiting period <br />( ) less than 15 min <br />( )15 min to 1h <br />( )1to4h <br />( )4to8h <br />( ),greater than 8 h <br />( ) variable (Briefly explain.) <br />15. What is the minimum amount of time necessary to set up equipment and complete a leak <br />detection test? (Include setup time, waiting time and data collection time. If a multiple -test <br />sequence is used, give the amount of time necessary to complete the first test as well as the <br />total amount of time necessary to complete the entire sequence.) <br />0.75 to 5 h (single test) <br />h (multiple test) <br />16. Does the system compensate for those pressure or volume changes of the product in the <br />pipeline that are due to temperature changes? <br />(X) yes ( ) no <br />17. Is there a special test to check the pipeline for trapped vapor? <br />Description - Pipeline Leak Detection System Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.