My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1999-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:10:52 PM
Creation date
6/23/2020 6:47:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2011
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1999-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />IMPORTANT! Wire used for this installation must have a temperature rating of at least 90°C. be either 14 or 16 AWG, <br />and be color coded. Splicing alarm power with TLS Console power will cause improper operation of the monitor. <br />Wiring Overfill Alarm with Acknowledgement Switch <br />1. Pull two wires from the switch to the Overfill Alarm. <br />2. Pull two wires for line and neutral from the switch to the power panel. <br />3. Pull one wire from the switch to the TLS Console for connection to the alarm relay. <br />4. Pull one wire for line from the alarm relay in the TLS Console to the power panel. <br />5. Turn power Off and connect wiring according to the wiring diagram in Figure 3 and Table 1. <br />utre <br />® ®M <br />® �N <br />Overfill Alarm <br />(cover open) <br />----------------------- <br />Horn Time <br />Delay Relay <br />--------------------------- <br />i !--------------- -- Ack Switch ' <br />(cover open) <br />To Console Relay - <br />See Console Connection <br />® M <br />Table in this manual ® a <br />®•� <br />Customer supplied <br />junction box------------------------------------- <br />console\—Kwlr.eps N L <br />---------------------------- <br />To power panel <br />Figure 3. Overfill Alarm/Acknowledgement Switch wiring connections <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.