Laserfiche WebLink
E <br />SWRCB, January 2002 <br />Test Method Developed By: ❑ Piping Manufacturer N Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: 19 Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 to 15 PSI Glycerin filled Pressure Guge --- f Equipment Resolution: 0.2 PSI <br />Piping Run # "'P'Y'R� Piping Run* to ?ATS L"'E Piping Run# sumy LTm Piping Run # <br />LNE "USHM) (GeM?ATOR) (MUSM) <br />Piping Material: <br />PLASTIC <br />PLASTIC FIBERGLASS <br />Piping Manufacturer: <br />TOTAL CONTAINMENT <br />TOTAL CONTAINMENT TOTAL CONTAINMENT <br />Piping Diameter: <br />41# <br />40' 401 <br />Length of Piping Run: <br />45' <br />47' 13' <br />Product Stored: <br />DIESEL <br />DIESEL DIESEL <br />Method and location of <br />piping -run isolation: <br />4"TEST DONUT <br />4"TEST DONUT 4"TEST DONUT <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />I HR. <br />I HR. I HR. <br />—starting <br />Test Start Time: <br />8:30 A.M. <br />8:30 A.M. 8:30 A.M. <br />Reading (Ri): <br />5 PSI <br />5 PSI 5 PSI <br />—Initial <br />Test End Time: <br />9:30 A.M. <br />9:30 A.M. 9:30 A.M. <br />Final Reading (Rf): <br />5 PSI <br />5 PSI 5 PSI <br />Test Duration: <br />I HR. <br />I HR, I HR. <br />Change in Reading (Rf-Ri): <br />0 <br />0 0 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 0.002 <br />Test Result: <br />PASS <br />PASS PASS <br />Comments - (include information on repairs made prior to testing, and recommended fallow -up far failed tests) <br />Revision: <br />