My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1999-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:10:52 PM
Creation date
6/23/2020 6:47:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2011
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1999-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 0 <br />E <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ other ( <br />SPect <br />Test Method Uses: 0 Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specik) <br />Test Equipment Used: Resolution: <br />UDC # <br />UDC # <br />U DC# <br /># <br />Manufacturer: <br />_UDC <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Testedi <br />Does turbine shut down when <br />UDC sensor detects either <br />product or water?* <br />Turbine shutdown response <br />timet * <br />Is system programmed for fail- <br />safe shutdown?* <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />—starting <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (Rf): <br />Test Duration: <br />—Change in Reading (Rf-Ri <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />i If the testing method does not test the entire depth of the UDC, specify how much of the UDC was tested. Methods not testing the <br />entire UDC should only be used if the monitoring system provides fail-safe shutdown. (See SWRC13 LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment method used does not test the entire volume of the UDC. <br />* This information is not needed if the entire sump is tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.