Laserfiche WebLink
11 <br />SWRCB, January 2002 <br />Page 3 of 7 <br />Revision: <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer N Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: <br />N Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:O to 15 Psi <br />Glycerin -Filled Pressure Gauge Equipment Resolution: 0.2 Psi <br />Piping Run # Sup/Ret Line(Pol) <br />Piping Run #Sup/Ret Line(Gen) Piping Run #Supply Line(Pol) Piping Run # <br />Piping Material: <br />Plastic <br />Plastic Fiberglass <br />Piping Manufacturer: <br />Total Containment <br />Total Containment Total Containment <br />Piping Diameter: <br />4" <br />4" 4" <br />Length of Piping Run: <br />42' <br />47' 13' <br />Product Stored: <br />Diesel <br />Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />4" Test Doughnut <br />4" Test Doughnut 4" Test Doughnut <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />1 hr <br />1 hr 1 hr. <br />Test Start Time: <br />8:05 AM 8:10 AM <br />Initial Reading (R(): <br />5 psi. 5 psi. <br />Test End Time: <br />9:05 AM 9:10 AM <br />Final Reading (RF): <br />5 psi. 5 psi. <br />Test Duration: <br />1 hr. 1 hr. <br />Change in Reading (RF -RI): <br />0 0 <br />Pass/Fail Threshold or Criteria: <br />0.002 0.002 <br />M <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />No Repairs Made. <br />Polisher supply and return line (share same secondary) from the piping sump to the polisher failed pressure test due to a torn <br />termination test boot located inside of polisher box. Need to replace termination boot. <br />Generator supply and return line (share same secondary) from piping sump to piping vault inside of generator room. <br />Supply line for the polisher runs from the fill sump through the piping sump. <br />Revision: <br />