Laserfiche WebLink
i • <br /> veriZn <br /> ROUTINE MONITORING PROCEDURES <br /> Section 2632 (d)(1) Title 23 CCR, Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name: VERIZON Manteca Central Office <br /> Facility Address: 430 W. Center Street <br /> Manteca <br /> UST Installed: Double Wall Joor Plasteel Composit 6,000 Gallons Containing <br /> Diesel Fuel, for the Emergency Generator. <br /> Piping Installed: Doubled Wall "Enviroflex" non-metallic flexible piping system for <br /> the product supply and return lines. <br /> Double Wall - Primary: Scotchkote 206N (Fletcher coat) <br /> Schedule 40 Steel for the vent line. <br /> Secondary Containment: Enviroflex for the product supply and return; <br /> Fiberglass, for the vent line. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> • Double wall UST Interstitial space and its two sumps <br /> • All piping and risers below grade <br /> • Piping vault <br /> Environmental Affairs, P.O. Box 725, Chino, CA 91708, <br />