Laserfiche WebLink
a <br />0 0 <br />SWRCB, January 2002 Page 7 of 7 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Other (Specie) <br />® Industry Standard ❑ Professional Engineer <br />Test Method Uses: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum N Hydrostatic <br />Test Equipment Used: INCON TS -STS SUMP TESTING SYSTEM <br />Equipment Resolution: 0.002 <br />Spill Box # 1 Spill Box # <br />Spill Box # Spill Box # <br />Bucket Diameter: <br />12" <br />Bucket Depth: <br />11" <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />30 MIN. <br />—starting <br />Test Start Time: <br />12:23 PM/12:54 PM <br />Initial Reading (Ri): <br />5.8458"/5.8205" <br />Test End Time: <br />12:38 PM/1:09 PM <br />Final Reading (Rf): <br />5.8446"/5.8205" <br />Test Duration: <br />2X15 MIN. <br />Change in Reading (RF-Ri: <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.002" <br />Test Result: <br />PASS <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Please direct any comments regarding this form to: <br />SWRCB UST Program, Attn: Scott Bacon <br />1001 "I" Street, Box 944212 <br />Sacramento, CA 95814 <br />Phone: (916) 341-5873, Fax: (916) 341-5808 <br />e-mail: baconsCcr)cwp.'swrcb.ca. og_v <br />Revision: <br />