My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of giggs z 1 11 1 <br />I Site map enclosed-'? YES [ ] NO [ ) <br />2 Submit copies of ICC Service Technician and/or Installers certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired oa replaced Ensure a Copy Of the 'Site Health and Safety <br />Plan" is avai able on the jobsite as required by Title 8' <br />3 Detailed description of work to be completed List components to be repaired or replaced and attach a dr�gram drawn <br />to scale showing location of repairs andlor replacements If repairing a component, describe how this )Will be done (if <br />gdding piping UDC�s, or other LIST equipment, or performing tank tOP upgrade, use the LIST Instagkon Application <br />pages 4-8 as necessary for a timeJy plan review) <br />4 List of equipment to be used (Attach manufacturer's SpCification sheets showing third -parry approval} <br />j U1 N <br />ANA <br />N\J <br />
The URL can be used to link to this page
Your browser does not support the video tag.