My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.1-Ahlbit A <br />L The existing generator enclosure has a very small day tank that transfers 1 e fuel <br />between the generator and the existing double wall underground tank, Th day tank <br />will also be removed along with the generator and the enclosure, / <br />Z T he existing double wall fuel lines frOrn, the underground tank cc Inside the <br />enclosure in a vault/trench, <br />3. We will be constructing an enclosed metal cover at the/ ch/vault where the <br />t <br />existing fuel lines come through the ground and concrete s ail of the trench/vault <br />to keep rain water out. 1011 <br />4. This vault Will have monitoring sensor for fuel leak, <br />S. New fuel lines will be connected to the (2), exist <br />" fuel lines, 1 supply and 1 return, <br />tc <br />in the vault to be connected to a new 275 gallon tdoot day tank that would transfer <br />he fuel between the existing Undergiound doub tank and the new generator, <br />6. The new fuel line which will all be aboveground can be single waH black iron pipes, <br />as allowed by code, <br />7. The Plumbing drawings should indi / / te our intention to cornply, with code required <br />fuel leak monitoring, <br />& There is an existing fuel polishei I (filter) that has not been in use for many <br />years. This equipment will be removed and the fuel line between it and the <br />under -ground fuel tank will be removed- The vault/sump at the underground tank where <br />this fuel polisher fuel lines passIIFOLJgh to enter, the tank, the plumbing drawing <br />requires the Conti -actor to plu 1�ged or repair it to meet regulatory requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.