Laserfiche WebLink
1.1-Ahlbit A <br />L The existing generator enclosure has a very small day tank that transfers 1 e fuel <br />between the generator and the existing double wall underground tank, Th day tank <br />will also be removed along with the generator and the enclosure, / <br />Z T he existing double wall fuel lines frOrn, the underground tank cc Inside the <br />enclosure in a vault/trench, <br />3. We will be constructing an enclosed metal cover at the/ ch/vault where the <br />t <br />existing fuel lines come through the ground and concrete s ail of the trench/vault <br />to keep rain water out. 1011 <br />4. This vault Will have monitoring sensor for fuel leak, <br />S. New fuel lines will be connected to the (2), exist <br />" fuel lines, 1 supply and 1 return, <br />tc <br />in the vault to be connected to a new 275 gallon tdoot day tank that would transfer <br />he fuel between the existing Undergiound doub tank and the new generator, <br />6. The new fuel line which will all be aboveground can be single waH black iron pipes, <br />as allowed by code, <br />7. The Plumbing drawings should indi / / te our intention to cornply, with code required <br />fuel leak monitoring, <br />& There is an existing fuel polishei I (filter) that has not been in use for many <br />years. This equipment will be removed and the fuel line between it and the <br />under -ground fuel tank will be removed- The vault/sump at the underground tank where <br />this fuel polisher fuel lines passIIFOLJgh to enter, the tank, the plumbing drawing <br />requires the Conti -actor to plu 1�ged or repair it to meet regulatory requirements. <br />