My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9111111110 <br />Elena K. Manzo [EH] <br />From: Elena K. Manzo [EH] <br />Sent: Wednesday, May 20, 2015 4:43 PM <br />To: 'mark crisp' <br />Cc: Garrett Backus [EH] <br />Subject: RE: 430 W Center Street, Manteca, CA, <br />m <br />Page 1 of 3 <br />Dear Mark, <br />I am still in the process of reviewing your response and I may have further questions, but meanwhile, to speed up <br />the process, please provide the following information: <br />1) Fill out and provide the requested/missing permit application pages, please refer to my letter dated <br />May 8, 2015. <br />2) Revise your scope of work to reflect all the proposed work (including the proposed pipe removal and <br />penetration abandonment procedure, including the type of "non corrosive material" you are going to <br />apply to the schedule 80 pipe"). Also, please provide a statement from the manufacturer of existing <br />tank top sump penetration(s) (this pertains to the flex line that will be removed) that the proposed <br />"plugging" method is approved with their penetration product. Provide a site map that will correspond <br />to your proposed scope of work, identifying the line to be abandoned, etc. <br />3) Although you don't plan to break out concrete, we will be requiring confirmation sampling below the <br />removed piping, so please fill out the appropriate permit application pages and explain how you will <br />collect the necessary soil samples. <br />4) Please verify that appropriate product line penetrations are installed inside the "existing above <br />ground raceway". it's is my understanding that the underground product piping transitions to above <br />ground inside this vault. <br />Please don't hesitate to call or email me if you have any questions. <br />Sincerely, <br />Elena K. Manzo, REHS <br />San Joaquin County <br />Environmental Health Department <br />1868 E. Hazelton Ave. <br />Stockton, CA 95205-6232 <br />Voice: (209) 953-7699 <br />From: mark crisp [mailto:mark@pc-inc.net] <br />Sent: Monday, May 18, 2015 12:55 PM <br />To: Elena K. Manzo [EH] <br />Subject: Re: 430 W Center Street, Manteca, CA, <br />Elena, Please see below response to all of your comments. <br />1. These fuel lines are flexible fuel pipe that is ran through a 4" corrugated conduit/ raceway that is not <br />going to be removed. We are going to remove the fuel lines out of the conduit and leave the conduit <br />underground. Once the fuel lines are removed we will be plugging the penetrations inside the UST sump <br />with standard schedule 80 pipe and painting them with a non corrosive material. We will insert the <br />schedule 80 pipe into the sump penetration and tighten the existing clamps to ensure the water tightness <br />of the sump. <br />2. I see that the drawings show this as "new fuel pipe vault" but it is an existing above ground raceway <br />that is visually inspected once a month. We will be re-routing the pipe from the existing indoor daytank <br />that will be removed to the new weather proof day tank that will be installed. We will be placing a metal <br />cover over the piping in case of rain. <br />5/20/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.