My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 4:26:49 PM
Creation date
6/23/2020 6:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
YOSEMITE PETROLEUM
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231426_2072 W YOSEMITE_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i AMENDED Environmental Health Department <br />SANAOAQUIN � la�,►�1►q <br />COUNTY <br />s. F}; <br />lJnderground'Stoirage Tank Program,inspection Report <br />,. <br />Facility Name: Facility Address: <br />f EtteQUICK <br />SHOP 2072 W YOSEMITE AVE, MANTECA <br />ber 19, 2018 <br />SUMMARY OF YIOLATCONS <br />(CLASS 1, CLASS II, or MINOR -Notice"omply) <br />Item # <br />Remarks <br />113 <br />CCR 2638(c), 2638(d) Failure to submit "Monitoring System Certification Form" within 30 days of completion of the <br />test. <br />Annual monitoring system certification, leak detector testing, and spill container testing was performed on March <br />3rd, 2017 and September 19th, 2017 and a test report was submitted on March 23rd, 2018, 5 months late. A copy <br />of the test report must be submitted within 30 days of the tests. Take all necessary precautions to ensure testing <br />and submittal of test reports are performed in a timely manner. <br />This is a repeat violation, Class 11. <br />121 <br />CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report. <br />An inspection was last done on 9/19/17 and an inspection report was issued identifying information to be submitted <br />to bring this site into compliance. This information was required to be submitted by 10/19/17 . This information was <br />received on 3/23/18, late resulting in a non-compliant status for this facility. An operator that receives an inspection <br />report shall have 30 days to submit a written response that includes a statement documenting corrective actions <br />taken or proposing corrective actions which will be taken. Ensure that a written response documenting corrective <br />actions taken or proposed is submitted within 30 days of receiving an inspection report. <br />This is a repeat violation, Class II. <br />123 <br />CCR 2637.1(d), 2637.1(e) Failure to submit the "Spill Container Testing Report Form" within 30 days after the test. <br />Spill container testing was performed on March 3rd, 2017 and September 19th, 2017 and a test report was <br />submitted on March 23rd, 2018, 5 months late. A copy of the test report must be submitted within 30 days of the <br />tests. Take all necessary precautions to ensure testing and submittal of test reports are performed in a timely <br />manner. <br />This is a repeat violation, Class 11. <br />201 <br />CCR 2712(b) Failure to maintain monitoring, maintenance, and follow up action records. <br />Maintenance and monitoring records for the last three years were not found on site. An alarm for L-13 UDC 7/8 <br />occurred on 5/4/18 however no records on how this alarm was responded to were found on site. These records <br />shall be maintained on site for at least three years. Monitoring records include: (1) date and time of all monitoring or <br />sampling; (2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, ground water elevations, or other test results; (6) results of inventory readings and reconciliations. <br />Immediately locate and maintain all maintenance and monitoring records for the last three years on site and submit <br />copies to the EHD. <br />This is a repeat violation, Class ll. <br />FA0004625 PR0231426 SCO01 10/19/2018 <br />EHD 23-01 Rev. 09/28/2018 Page 5 of 6 Underground Storage Tank Program OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.