Laserfiche WebLink
MATZVAAL AND WOONUAANUM <br />L UNLESS OTHERWISE SPECFICALLY PROVIDED N THESE DOCUMENTS, ALL <br />ECUIPMEfT, MATERIAL, AND ARTICLES INCORPORATED N THE WORK <br />CO/ERED BY THESE DOCUMENTS ARE TO ER NEW APD OF THE MOST SUITABLE <br />GUIDE POR THE PROCESS INTENDED. <br />2. THE CONTRACTOR SHALL PJANIO H TO TFE OWNERS AGENT FOR HIS <br />APPROVAL THE NAME OF THEM THE MODEL NUMBER. AUD <br />OTHER IDENTFI'NG DATA AND INFOR•1ATICH RESPECTING THE <br />CAPABILITY. NATURE. AND RATING OF THE MACHINERY AND <br />MECHANICAL AND OTHER 2=IPIlw4T URACHI THR CONTRACTOR CG,RTEMPLATEB <br />INCORPORAT11-4 N THE WORK WEPT REQUIRED BY THE OWER'8 AGENT. <br />3. WEEN SQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE <br />OUNEEWS AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR <br />APPROVAL FULL WORHATION CONCERNING THA MATEMAL OR ARTICLES <br />WINCH HE CONTEMPLATES INOOPWORATING N THE WORK. 04E N 80 <br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR ASPPID`/AL AT THA <br />CONTRACTORS EXPENSE, WITH ALL PREPAID. <br />4. MACHNERI', EGWF'MENT, MATERIAL, APD ARTICLES INSTALLED OR USED <br />WITHOUT IEQIRED APPAL SHALL BE AT THE FRISK OF 81J3SEOWEI4T <br />REJECTION <br />5. ALL WOI K TO BE DOPE N ACCORDANCE WITH APPLICABLE CODES AND <br />FlEdULATIONS. <br />6. ALL MATERIALS SHALL BE INSTALLED PER MAMF S O,bTRUCTIQib <br />APD THESE DOCUMENTS. C4NFL.ICT9 SHALL BE BROUGHT TO THE ATTENTION <br />OF THE OW�IIEW8 ENGINEER <br />1. F ANY OF THESE 000UMENTS NDCATE A COFLICT WITH THE STATE OR <br />LOCAL REQIREMENTS AS AM CLIRFROMY N M"CT AT THE TIME O) T1416 <br />PROJECT, IT 1$ EXPECTED TWT THE MOST RESTRICTIVE CCfDITIOWS) <br />WOULD APPLY. <br />L CONTRACTOR EMPLOYEES TO HAVE COMIPLETED 40 HOLM OSW TRAINING <br />COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE <br />PROVIDED TO THE Ou`ER'S ENGINEER PRIOR TO THE START OF WORK <br />A. C:CNTRAGTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MAIAFACTURERIS <br />TRAINING RECrWIREMEITB N ACCORDANCE WITH F&4 CALIFORNIA UST <br />REGULATION. CERTFCATES SHALL BE PROVIDED TO OWER. <br />CCNTRACTOR BULL C40PMETE THE PIPING INSTALLATION CHECKLIST <br />SUPPLIED PIPING MANUFACTURER AND SHALL FLRNIS4 THE CHEC KL16T TO <br />OWNER <br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK <br />MAAAFACT ITER N CORRECT TANK INSTALLATION N ACCORDANCE WITH 1934 <br />CALIFORNIA UST REGULATIONS. CERTIFICATES SMALL BE IPRC�AIOEO TO OWNER. <br />4. CONTRACTOR SMALL HAVE THE FOLLOWING LICENSEE: <br />A (MERAL ENGIEERNG "A" <br />B HA:AFDOUS MATERIAL SUBSTANCE HANDLING ('4A�-) <br />5. CONTRACTOR SHALL WAVE THE FOLLOWING INSURANCE, CONTRACTOR SHALL <br />"',E PROOF OF SUCH INSURANCE ON FILE WITH OWER BY NAMING OWER <br />AS 'ADDITIONAL INSURED'. <br />A STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY <br />S. COMPREFEIST/E GENERAL LIAUBLMY, WITH A C42 DIED SINGLE <br />LIMIT OP NOT LESS THAN 11,000400 PER OCCURRENCE FOR BODILY <br />NARY AND PROPERTY DAMAGE. <br />C AUTOMOBILE LIABILITY COVERING USE OF ALL CUeD HIRED <br />'/EHICLES WITH A COMONED SINGLE LIMIT OF SINGLE WIT OF LIABILITY <br />CP NOT LESS TWIN $4000000 PER OCCURRENCE FOR BODILY INJURY AND <br />DAMAGE. <br />6. GENERAL. CONTRACTOR TO RMISM ALL LABOR MATERIAL, EQUIPMENT, AND <br />SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE <br />SATIVAGTORY COMPLETION O" ALL WORD SHOWN OL CALLED FOR OR <br />REQUIRED BY THE DRAWINGS. <br />T. ALL WORK SHALL BE IN ACCORDANCE WITH THE UNIFORM! <br />BUILDING CODE, FIRE CODE. NATIOWL ELECTRICAL CODE, <br />CALFO IA UNDERGROUND STORAGE TANG RECGILATIONS, 06" <br />CONSTRUCTION SAFETY ORDERTS, APD ANY OTHER APPLICABLE STATE, CITY, <br />OR COUNTY ODI INCE$. <br />TO BE SECURED BY OWER APD SUPPLIED TO CONTRACTOR <br />OORRACTOR L5 RESPONSIBLE FOR COMPLYM WITH ALL PERMIT <br />CONDITIONS. <br />S. GENERAL CO TIRACTCM SWILL VISIT SITE AND FAMILIARIZE HIMSELF Or - <br />ALL <br />ALL EX.ISTNG CONDITIONS PROF TO SUBMITTING HIS BID, <br />10 GENERAL CONTRACTOR SMALL PROTECT ALL EXISTING FACILITES TO <br />REMAIN LNLESS NOTED OTHERSM C4ONTR4GTOR SMALL REPAIR OR <br />REPLACE TO TME SATISFACTION OF Ti ATIVE ANY <br />EXISTING FACILITES THAT AIRE DAMAGED BY THE CONTRACTOR'S <br />OPERATIONS. <br />L ALL EXCAVATIONS SHALL BE P1111001IMED, N COMPLIANCE WITH 06" AND <br />STATE REGULATIONS. THE CONTRACTOR 18 REIRERRIED TO THE OSHA <br />BOOKLET. 'EXCAAVATlIS AND TRENCHING OPERATIONS", FOR A SAFE WORD <br />PRACTICES GUIDE FOR PEPFCOCIM EXCAVATION WORK <br />D. UPON Or PIRIPABOT CONTRACTOR $MALL PROVIDE 0040M WITH <br />"AS BUILT" DR,4WING6 OF ALL ITEMS INSTALLED BY SAME. "AIS SULTS' <br />SMALL BE COMPLETED ON -ERE UTH NFORMATIOJ NOTED DIRECTLY ON <br />APPROlvIED JOB COPY. <br />D. CONTRACTOR SHALL PRK)VION A LIST OP SB -CONTRACTORS, F ANY, WHO <br />WILL BE USED ON THE PROJECT. <br />I4. CONTRACTOR SMALL C40O DINATE ALL NSPECTONS AHD APPROVALS AND <br />OBTAIN, AT THE COPPLETKAN OF TE PROJECT, ALL C MWFCATES <br />RE=W&P TO RN THE RACLITY. <br />1 <br />n <br />S. GO`.ERNNCG CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED <br />TO, THE STANDARDS O' THE FOLLOWING, <br />AUBRICAN NATIONAL STANDARDS INSTITUTE (AUN01> <br />-u`4ERICAN PETROLEUM INSTITUTE (API) <br />A l'IMCAW SOCIETY FOR TESTING AND MATERIALS (ASTM) <br />l940 -CMI BULDNG CODE (IBC) <br />NATWX44L ELECTRIC CODE (NEC) <br />NATIONAL PIRE PROTECTION ,AGENCY (NMA) <br />UNDERWRITER'S LABORATORIES, INC (LL.) <br />CALIFORNIA CODE OF REGULATIONS (CCR) <br />LOCAL CRI NANCEB <br />16. SAFETY PLAN, CONTRACTOR SHALL DEVELOP AND MAINTAIN, FqR THE <br />DURATION OF THE CONTRACT, A SITE HEALTH H SArErT' PLAN THAT WILL <br />RFMC711MLY INCORPORATE AND IMPLEMENT REQU D $.VETT PR 11461ON6, <br />FOR TAMC / LIME REMOVAL APD INSTALLATION, PRIOR WORK START, AND: <br />A, APPOINT AN EMPLOYEE AS THE SAFETT' O410ER W 0 B OUALF09 <br />AND AUTHORIZED TO SUPER✓ISE AND EWORCE COFPLW CE WITH THE <br />HEALTH AND SAFETY PLAN. SUBMIT THE NAI'E AND (AWJ.LFICATIONS OF <br />THE SAFETY OFMCER TO THE OWNER'S AGENT PRIOR TO =M ENCNG WORK <br />OJ THE SITE. <br />B: THE PLAN SHALL CONTAIN THA NAMES: ADORESOE6 AND TELEPHONE <br />NUMBERS O- THE 6U'ERA60RY PERSONNEL, THE HOSPITAL FACILITIES <br />NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES, SHALL BE <br />WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS <br />OR HA.OARDOUS SUBSTANCES BE WOO✓ERED. <br />C: C 34CXZT WEEKLY JOB SITE SAFETY MEETINGS UITH EMPLOYEES <br />AND SUPPLY THE M=TNG MINUTES TO OWNER WNW REQESTAD. <br />D, F, DURING THE COURSE OF THE WORK, UJ0.1PE C4NDITIONIS DEVELOP <br />OR AM ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE <br />CONDITION. F THE CORRECTIVE ACTON 16 NSIF"CIENT N THE <br />OPNION O' THE O"P" AGENT, CO"TRJCTIOW WORK SHALL CEASE UNTIL <br />CORRECTIVE ACTION CAN BE <br />E, PROVIDE A MNMJI OF TWO FIRE EXTINGISWERS WITH A MINIMUM <br />CLASS RATING O- 2 -A,0 -8-C WITHIN 50 FEET OF THE OPERATION. <br />11. UNDERGROUND SER/KE ALERT (US.AJ - THE CAWI RACTOR SHALL NOTIFY <br />MEMBERS OF USA. 2 FULL WORKING DAYS N ADVANCE OF PERFORMING <br />ANY EXCAVATION IARC BY CALLING TE TOLL. -FREE ONE -CALL PROGRAM <br />N IBER (800) 221-2600. <br />WORK SCOPE <br />1. PRIOR TO THE START OF WORK PROVIDE OWER WITH WORD PLAN AND <br />SCHEDULE TWT ALLOWS THE 614E'S $TOE TO REMAIN OPEW TO THE <br />FULLEST EXTENT POWSLE. <br />-. FENCE OW IIA AREA WITH 6' HIGH CHAIN LINK FENCE. POST 'KEEP <br />CUT" SIGNS ON FENCE EVERY 30 FEET AT THE END OF EACH WOR, DAY <br />SECURE FENCING PANELS T T4ER <br />3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TAWS TO <br />DISPENSER ISLANDS. <br />4. 1110MOVF ALL EXISTING FUEL D . ISLANDS, EARRICADES, FURL <br />LINES, ASPHALT AND CONCRETE SURFACES AS REQUIRED, N <br />PREPARATION FOR N$TALLATCH OF NEW AS SHOWN ON DRAW41436. ANY <br />SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY <br />OILER REPRESENTATIVE <br />5. OWNER WILL CONTRACT WITH AND FURNISH OCNIG LTANT6 TO PEFFOR'1 SOIL <br />AND/OR WATER 1E61ING UPON PIPING REMOVAL N ALCCO (DANCE WITH <br />PIPING REMOVAL PLAN AND LOCAL REGULATIONS, fALLOW TUiE1TY-FOR <br />RO UR0, FOR RESULTS OF SOL SAMPLES-) <br />6. CONTRACTOR SHALL PLACE EXCAVATED SOL OR AND SMALL COVER WITH, <br />4 MIL. PLAbTIC UNTIL SOIL 16 FRISMa,11110, ANY EOL t0 ISE 6TOCKPILED ON <br />SITE FOR SAMPLING PRIOR TO OP -AUL BY OTHERS AS DIRECTED BY <br />OWER. <br />1. OWNER SMALL PRO`/IDE FOR TRANSPORTATION AND DISPOSAL O ALL <br />EXCAVATED SOIL AFTER COMPLETION OG ANY NECE$6ARY RNMEDIATICK <br />ICLLDNG AERATION. <br />S, F REQUIRED FOR ABANDCHED EXCAVATIONS, BACSPILL ONCE ALL SAMPLING <br />ANDS OVER -EXCAVATION IS CCMPLETED. BACKFLL MUST BE ENGINEERED <br />FILL COMPACTED TO W%. THE CONTRACTOR t& !RESPONSIBLE FOR <br />CERTFYNG THE COMPACTION A THIRD PARTY ENGINEER MAY WITNESS <br />THE PROCESS, ALD CERTIFY THAT THE HOPE WAS COMPACTED PRDFER-Y TO <br />WITHIN 4 FEET OF SURFACE. ONE (1) TEST WILL THEN BE REGURED AT <br />4- AND 2- AND 0', FOR A TOTAL OF THREE (3) C0MPACTM TEST& <br />PROVIDE RESULTS TO 00ER'S ATIVE. <br />9. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW E61,11IN ENT. <br />ID. "TALL '"TYPAW FILTER FABRIC LINER PIPING TRENCHES, PER , <br />WERE REQUIRED SY WET -HOLE CONDITION& <br />IL INSTALL EQIPMENT AS LISTED N EQUIPMENT LIST INCLUDING <br />SALVAGEABLE EQUIPMENT TO BE REINSTALLED, F ANY, AND PROVIDE APD <br />INSTALL ALL OTHER E .A8 ItECMF= TO Plm`/DE A COMPLETE <br />PETROLEUM SYSTEM <br />12. PROVIDE AAD INSTALL NEW PRODUCT, VENT VAPOR AND SECONDARY <br />CONTAINMENT LIES PERCURRENT MAMF <br />IETRCTICPB SMALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS, VWWACTLIMMS C4ECKLISTO <br />SHALL BE COMPLETED BY THE COITRAACTOR AS EACH STEP 16 <br />A, PRODUCT PPNW, 2• PRIrIARY PIPING WITH 3" CONTAINMENT SYSTEM <br />AS APPRDvW DY ALL PIPING APD CONTAINMENT SYSTEMS SHALL <br />BE UL APPROVED FOR MOIL METHANOL. CONTAINMENT SYSTEM SMALL <br />BE BY THE 6AI-E MANUFACTURER, UTH THE SAME WPM ADHESIVES <br />AND / OR FITTING& <br />B: `/ENT / VAPOR PIPNGA RED THREAD IA AND RED TWIREAD It WITH <br />FITTINGS AND 10010 AND 6000 SEIRIES, ADHESIVE, OR AMERON DUbLOY <br />3000L WITH ALCOHOL PITTINGS AND RP48 ADHESIVE. DO NOT MIX <br />MANIPACTIAIIEFIR& MATERIALS <br />C. NOTA LLN3 PIPING MUST Rx CEWPIND AS HAVING sM <br />TRAINED BY MANI RAGTUER <br />v <br />0- STEEL PIPE, ALL METAL PIPING SHALL BE BLACK IRON <br />40. OR EXTRA STRONG. GALVANIZED PIPE 16 NOT AILLOUED. FPTTNG8 <br />SHALL BE 300 PSI MALLEABLE IRON. <br />E: ALL STEEL PIPE BELOW GRADE 18 TO 15E DOUBLE OTN 20 <br />MIL Pr- PIPE WRAP, OVER A PIPE WRAP PRIrErt FOR USE WITH 'SRM <br />TAPES, AND SHALL BE BY THE SAME MANFACTURER AS THE WRAP. <br />R ALL TWWADED 021NECTIONS SMALL BE THREADED WITH SEALANT <br />WHICH SHALL SE CURRENTLY SAFIR44TED BY MANUFACTURIM FOR FULL <br />COMPATIBILITY WITH THE PIPING MATERIAL UI6EG, AND POR USE WITH <br />PETROLEl1 SOLVENTS, BELS, OLS, DIESEL, AND 100% METHAMOL, W-0CN <br />SHALL DE ',E PIED BY CURRENT MAKFACTIMER'S PRODUCT DATA SHEET. <br />G: G.C. SHALL DEMONSTRATE TO OWNER'S WNTATIVE TWT ALL <br />MATERIALS AM NEW AMC) CO'I TO ABOVE SPECIFCATICN6. <br />13. DO NOT PLACE PRODUCT PIPING UNDER BULD WA. PIPING RIE OYER <br />TAPr-S SHALL BE MNDICED. MAINTAIN MN IUM CLEARANCE AS SHOWN ON <br />MNMCZE CROSSING OTHER LIFO AND CONDUIT. F PIPING <br />IS NOT SNOW ON SITE PLAN, GG. SHALL RN LIES THE MOST DIRECT <br />ROUTE SUBJECT TO APPROVAL BY OWAaS REPRESEHTATIVE. <br />HWPIPING SYSTEMS SHALL BE TESTED PER CURRENT MAPNFACT REWS <br />11,16TRCTIONS SHALL B: FOLLOWED AT ALL TIMES, AND SHALL WAVE <br />PRECEDENCE OVER OTHER NSTIRUC190N6. <br />A- GPC TO NOTIFY OWNER'S RE!FMSENTATI`,E TWO WORKING DAYS PRIOR <br />TO LINE TESTING. OILER'S REPRESENTATI`rE SHALL WITNESS ALL LINE <br />TESTING, MARC TESL $ ON GAUGE WITH ELECTRICAL TAPE AT <br />NG OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST OPE (1) <br />HOUR AND BE WITNESSED BY 0"" REPRE6ETATIVE. DO NOT BACKrILL <br />T HE9 UNTIL AUTHORIZED By OWER" REPRESENTATI`/E. <br />S- TEST PRESSURES SMALL W- <br />2' - 50 P91 AND APPLY SOAP SOLUTIO. <br />3" - 40 PSI AND APPLY SOAP SOLUTION. <br />3• - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION <br />C CAUTION. DISCCHRECT FLEX CONNECTOR FROM STP AND CAP PRIOR <br />TO TESTING. APPLY 0 RELEASE PIRMSSURE SLOWLY. VENTNAPOR SYSTEM <br />SHALL BE TESTED FROM TOP O' VENT, THROUGH MANFOAD(0), EXTRACTOR <br />BASE APD RISER STAKE I CONTAINMENT MANHOLES STAGE 11 VAPOR <br />LINES TO ISLANDS AND STAGE II FLET. CONNECTORS AT D S). <br />D. SLOJLY PRESSE PRODUCT LINES APD `/ENT/VAPOR SYSTEM TO SO <br />M. SOAP ENTIRE PPE 6UMAGES INCLUDING JONT5 AND FITTINGS. <br />CORRECT ANY LEAKS AND NEST. <br />E. SLOWLY RELI£,E PRESSURE FROM vAPOR/'✓ENT SYSTEM AND REMOVE <br />PLUG FROM EACH E%TRACTO R AFTER TEST. DUCE PRODUCT LINE <br />PRE TO 5 PSI, MONITOR DAILY UNTIL ALL YARD PAVING 16 <br />COMPLETE. <br />R SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY <br />PIPE SUIRFACES, PRESSMZE 6ECCPDARY PPE TO 5 PS AND SOAP ALL <br />PIPE SURFACE APD FITTINGS. PRESSURE ON THE PIPING SECONDARY <br />SPACE SHALL BE MAINTAINED UNTIL AFTER TE PAVING 19 N PLACE OVER <br />TANG FIELD AND PIPRNG RUNS, AND SHALL BE WTPESSEO BY THE OILER'S <br />aWWWWWALL NIDE DOCUMENTATION OF A DYNAMO BACKPIRESSURE <br />G. AFTER BEND WI71,ESSED BY OWNER'S MISR SENTATIVE, FRISMOVE <br />PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LIES AFTER <br />PAVING IS N PLACE <br />S. G.G. SHALL PEMORM PRECISION TEST CN PRODUCT LINES AFTER PA`✓M <br />16 COMPLETE AND PRIOR TO PNAL PROJECT ACCEPTANCE. PRECISION <br />LINE TEST SHALL. BE N ACCORDANCE WITH NFPA 32% LOCAL <br />IREGUIREMENTS, OR APPROlyW EQUAL. TEST SHALL BE CCrDUCTED BY A <br />CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION <br />TEST TO OWNER'S REPR?SENTATT✓E PROR TO CUM" " ACCEPTANCE OF <br />PROJECT. <br />16.. .. .. _.. <br />TEST OF ALL VAPOR RETURN i.NEB AS REQIRED BY LOCAL R.EGUL,ATIOH6. <br />n. CONTRACTOR SHALL DO ANY OTHER TESTING A6 REGORED BY LOCAL <br />REGULATIONS. <br />B. CONSTRUCT NEW FUEL ISLANDS AS SHOW ON <br />R BRAVO BOXE6, TL IE S111P6, AND OVERrILL BOXES ARE TO BE <br />COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OILER'S <br />SENTATNIE AS FOLLOWS. <br />L FLU. WITH WATER TO HIGHEST PENETRATION. <br />2. SPRAY PAIR top O) WATER <br />20. PROVIDE AND INSTALL CONDUIT H WIRING FOR PETROLEUM SYSTEM(6) AND <br />C:ILIO'Y L144MIrs. PROVIDE CONDUIT FOR FUTILE C.AIRDPE.ADERS AND <br />OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS <br />21. ALL CONDUIT 16 TO BE 3/4" (MNI'IM) W30 C4X40W. <br />M. INSTALL MCWOPM4G SYSTEM WITH INTERSTITIAL TURBINE SMP <br />PIROGES, AND TANK GAUGES, AND MONITOR C0NTPM PANEL IN BUILDING <br />PER DRA111111436. <br />23. INSTALL NOW DISPENSERS, AND CONTROL EQUIPMENT A8 INDICATED ON <br />SITE PLAN ALD DESCRIBED N THE EQ4PP15W LIST. <br />24. INSTALL SITE LKGNTIN G, F APPLICABLE. AND / OR ANY OTHER ITEM6 AS <br />SHOWN ON THE DRAWINGS. <br />23,. INSTALL NEW CONCRETE TAURK APD DRIVE SLABS AND OTHER CONCRETE AS <br />INDICATED ON SITE PLAN. CONE SWILL HAVE A MINIMUM <br />OOMPREMVE STRENGTH AT 28 DAYS O- 28018 PSI. OPHORETE SHALL <br />CONTAINS POUNDS OF LAMPSLA'WOC PER CUBIC YARD - USE DANS 8060. <br />26. REPAIR ANDK)R REPLACE A.C. PAVING AND BASE TO MATCH ORIG04AL N <br />AFFALAS 0I67BY WOR, <br />21. ANY EMARCNMENTAL WORK OUTSIDE TE ABOVE SCOPE OF WORK <br />SHALL BE DOME ON A TIME ANIDMATERIAL6 BASIS. RENTAL RECEIPTS, <br />SUbcowRACTOR INOICE6, MATERIAL mocaprM AND DALY LABOR TIME <br />SWEETS SMALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND <br />MATERIAL INVOICES. SUCH WORK SMALL BE BILLED SEPARATELY. <br />11 <br />PPMO VAL. sCa TESTWO PLAN <br />ID ORAL OFOR'ATICN <br />1.1 LOCATION OF T.NK& <br />CUK STOP 121 <br />MEW. <br />036 ILL LOUISE AVL. <br />N9 NOV 91 <br />M4NTECA CA W336 <br />KILL <br />(209) 239-2S' DI <br />11 OILER: <br />Q IK STOP MARKETS, INC. <br />PD. BOX 5148 <br />I � <br />FREiCHT, CA 94631 <br />15K7) 051-6500 <br />13 PROJECTED PROJECT 8TART, B DEC 91 <br />1A TANK& 3 SNCL. WALL FIBERGLAS6, BY XER/H8 (EXISTING TO REMAIN <br />lb HISTORY, <br />INSTALLED 1984 <br />ib CONTRACTOR& <br />GENERAL: <br />TO BE DETERMINED <br />GEOLOGIST: <br />GARY MLk.KE1' <br />COMPLIANCE H CLOSURE <br />(SIO) 426-5395 <br />2.0 REMO`/AL OF PIPING <br />SAN JOAOUN CO. DEPARTMENT OF ENVIRONMENTAL HEALTH DIVISION <br />GUDELNES APD SOL AND GR=DUATER SAMPLING REO U1REMENTS <br />SMALL BE FOLLOWED AT ALL TAMES, EXCEPT WARE THE FOLLOWING <br />SPED RCATIONS ARE MORE RESTRICTIVE. <br />OWER SHALL PILL ALL UST& TO 10% OF CAPACITY, PRS TO START, <br />PIPIW3 TO BE REMOAW SMALL SE EMPTIED OF ALL CONTENTS AOR TO <br />141111"W/AL. 10IPNG SWILL BE STOCKPILED ON-STE PRIOR TO DISPOSAL <br />DUE NOT NICE AIR OR WATER INTO THE EXISTING TANKS. <br />'VISUALLY INSPECT PIPE APD TRENCH FOR INDICATION OF LEAKAGE. A <br />SOL SAMPLE SMALL BE TAKEN AND ANALYZED AT THE ENDS AND AT <br />LEAST EACH TWENTY LINEAL FEET O TRECH, AND WHERE INSPECTION <br />OF TRENCH OR PIPING REVEAL EVIDENOS OF LEAKAGE. <br />F R48MCTIOI REVEAL6 EVIG O- LEAKAGE, IT SHALL BE <br />DOCUMENTED N WRITING, WITH PHOTOGRAPH& WERE APPROPRIATE. <br />SOL SAMPLES SHALL BE COLLECTED BRAN THE NATIVE SOIL AT OR <br />JUST BELOW THE INTERFACE OF THE 15AC104LL WITH THE UTNE SOIL. <br />SAMPLES SMALL BE TAKEN USING A DRIB -TUBE TYPE SAMPLER <br />CAPPED APD SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN - <br />OP -CUSTODY RECOR08 SHALL BE MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. <br />A THE ENDS OF THE BRA88 TUBE SHALU. BE C7/ERED WITH ALU'1RJLM <br />FOL, THEN PLASTIC END GAPS, AND RALLY WRAPPED WITH A SUITABLE <br />TAPE. <br />S. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, <br />POR TRANSPORT t0 A LABORATORY. FORMAL CHIAIN-CP-CUSTODY <br />RECORDS SHALL BE MAMAHM AND SUBMITTED FOR EACH SAMPLE <br />C F THE BOTTOM OF THE TRENCH 18 BELOW TWE GROUNDWATER TABLE, <br />SOL SAMPLES ARE NOT REQUIRED. N THIS CASE, A WATER B,AMPL.E <br />SMALL BE COLLECTED AS 6004 AS POSSIBLE PROM THE SURFACE OF <br />THE GROUNDWATER IN THE EXCAVATION A CHECK SHALL INITIALLY BE <br />MADE FOR ANY FREE FLOATING PRODUCT. F NO FLOATING PRODUCT 16 <br />DETECTED, THEN A WATER SAUBGLE SMALL SE TAS WITH A DEVICE <br />DESIGNED TO REDUCE THE LOSS O VOLATILE COMPONENTS, A BAILER <br />16 A SUITABLE 6AMPLNG DEVICE. THE WATER SAMPLE SHALL BE <br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSE (VOA) VIAL <br />WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE <br />USED TO SEAL. THIS NAI.. <br />SOIL AND WATER SAIMP1.E6 $ AL.L BE ANALYZED POR TOTAL <br />BY THE METHODS OUTLINED N 'GUIDELINES FOR <br />ACORE881NG REL. LEAKSCALIFORNIA REGIONAL. WATER QWAL.ITY <br />CONTROL. BOAR, SAN FRANCISCO BAY REGION - SEPTEMBER FWS." <br />119 <br />W rn <br />W ®r <br />�< I>Lt Oh <br />S2gVc0CC <br />fm <br />QxZZZON <br />M 00 wo AD <br />mEA'mmn <br />adim mWrx <br />4llic <br />L �L WDLL <br />1� <br />o ER <br />toa <br />OUIK STOP <br />121 <br />IIS& W. LOUISE AVE. <br />MANTECA, CA 95336 <br />(209) 239-2951 <br />SAN JOAQUIN COUNTY <br />AFN 211-410-43 <br />AURIN <br />P.O. BOX 1025 <br />843 WSKE LANE <br />WEST SACP.AtWrO, CA Wbill <br />('916) 312-1000 <br />FAX 313-1112 <br />TIM oplatmm AG <br />GORMY CP MSl7R W UNB4*iWt tti <br />4e Gw" w pm Ary HMG <br />o SNOW PFWA YGOI TIMI e4 <br />wm <br />�8/vp11/:PLWDm TwW ;m <br />HHWl1✓fJP® CGPW QRIRKB <br />�ar+1aW as a1im ta uta <br />"701 IC. <br />COPYRIGHT ® 1997 <br />DRALLN BY MEL / T G <br />CkWD' BY ''; <br />MEW. <br />DATE <br />N9 NOV 91 <br />B,42 <br />KILL <br />JHS NO. -L36� <br />REVISION" <br />DATE IRIEVI <br />PEOCRIPTIM D <br />I � <br />i <br />i <br />/� <br />ESO <br />TE/TI TITLE <br />GNOTES, <br />TES, <br />SCOPE, <br />PIPE REMOVAL <br />PET-5 <br />OF I SHEETS <br />