Laserfiche WebLink
Ank <br />TABLE OF CONTENTS <br />IMPORTANT- READ THIS FIRST..........................:..................................................................................................................3 <br />INSTALLATION TRAINING SEMINARS.....................................................................................................................3 <br />INTRODUCTION / SAFETY / CAUTION...................................................................................................................4 <br />PART ONE: INSTALLATION INSTRUCTIONS FOR PRIMARY PRODUCTS PIPING - RED THREAD IIA PIPE AND FITTINGS <br />Section 1 - Storage and Handling <br />1.1.1 Packaging, ordering and shipping information...............................................................................5 <br />1.1.2 Packaging......................................................................................................................................5 <br />1.1.3 Storing............................................................................................................................................5 <br />1.1.4 Transporting...................................................................................................................................5 <br />1.13 Loading and Unloading..................................................................................................................5 <br />Section 2 - Layout and Preparation <br />1.2.1 Inspection......................................................................................................................................6 <br />1.2.2 Installation crew size and organization.........................................................................................6 <br />Section 3 - Tool and Equipment List <br />1.3.1 Recommended equipment for cool weather pipe assembly...........................................................7 <br />1.3.2 Recommended equipment for installing 2" - 4" pipe.......................................................................7 <br />Section 4 - Joining Methods <br />1.4.1 General concepts...........................................................................................................................8 <br />1.4.2 Bell and spigot joining method.......................................................................................................8 <br />Section 5 - Cutting and Tapering <br />1.5.1 Cutting:.........................................................................................................................................9 <br />1.5.2 Tapering.........................................................................................................................................9 <br />Section 6 - Installation <br />1.6.1 Piping layout................................................................................................................................10 <br />1.6.2 Trenching and backfilling...........................................................................................................10 <br />1.6.3 Adhesive bonding........................................................................................................................1 1 <br />1.6.4 Joint assembly..............................................................................................................................14 <br />1.6.5 Adhesive cure time.......................................................................................................................16 <br />1.6.6 Connecting to other systems.........................................................................................................18 <br />1.6.7 Flexible hose connections............................................................................................................19 <br />1.6.8 Inspecting for potential causes of joint failure...............................................................................20 <br />Section 7 - Testing Recommendations <br />1.7.1 Safety precautions.........................................................................................................................21 <br />1.7.2 Test Procedures............................................................................................................................21 <br />1.7.3 Air test procedures and safety precaution.....................................................................................21 <br />Section 8 - Repair Procedures <br />1.8.1 Repairing weather damage...........................................................................................................23 <br />1.8.2 Pipe patching .................... <br />1.8.3 Repairing extensive damage.........................................................................................................23 <br />1.8.4 Leaking joints...............................................................................................................................24 <br />PART TWO: INSTALLATION INSTRUCTIONS FOR SECONDARY CONTAINMENT PIPING -RED THREAD IIA PIPE <br />AND RED THREAD IIA SECONDARY CONTAINMENT FITTINGS <br />INTRODUCTION...................................................................................................................................................25 <br />Section 1 - Secondary Containment Piping System Components <br />2.1.1 Secondary containment pipe........................................................................................................25 <br />2.1.2 Secondary containment fittings....................................................................................................26 <br />2.1.3 Adhesive for secondary containment piping...............................................................................:.26 <br />Section 2 - System Preparation <br />2.2.1 Piping layout..:.............................................................................................................................26 <br />2.2.2 Pipe preparation and tool set-up and use.....................................................................................26 <br />2.2.3 Pipe assembly...............................................................................................................................27 <br />2.2.4 Fitting assembly........................................................ ...............28 <br />