Laserfiche WebLink
Section 3 - Containment Crossover Detail <br />2.3.1 Preparation....................................................................................................................................29 <br />Section 4 - Termination Connections, <br />2.4.1 Termination at the storage tank. ..................................................................................................... 30 <br />2.4.2 Termination at the dispenser.........................................................................................................30 <br />2.4.3 Termination fittings.......................................................................................................................31 <br />Section5 - Secondary Containment System Size Reductions..................................................................................32 <br />Section 6 - Secondary Containment Saddles...........................................................................................................32 <br />Section 7 - Adhesive Bonding and Curing <br />2.7.1 Introduction...................................................................................... ..................34 <br />.......................... <br />2.7.2 Cleaning the bonding surface........................................................................................................34 <br />2.7.3 Bonding........................................................................................................................................35 <br />2.7.4 Assembling and bolting.................................................................................................................35 <br />2.7.5 Precautions....................................................................................................................................35 <br />2.7.6 Adhesive cure................................................................................................................................35 <br />Section 8 - Testing Recommendations for Secondary Containment Piping............................................................36 <br />Section 9 - Repairs <br />2.9.1 Replacing leaking secondary containment joints...........................................................................37 <br />2.9.2 Repairing minor pipe damage.......................................................................................................37 <br />2.9.3 Repairing extensive pipe damage...........................:......................................................................37 <br />PART THREE: INSTALLATION INSTRUCTIONS FOR TELESCOPING PIPE SYSTEM <br />Section 1 - RED THREAD" IIA Secondary Containment Telescoping Pipe System <br />3.1.1 Telescoping system.......................................................................................................................39 <br />3.1.2 Assembly......................................................................................................................................39 <br />3.1.3 Description...................................................................................................................................39 <br />3.1.4 Installation....................................................................................................................................39 <br />LIST OF TABLES <br />PART ONE: <br />Section 1 <br />Table 1.1.1 Standard Packaging of Pipe........................................................................................................5 <br />Section 2 <br />Table 1.2.1 Suggested Units of Labor for Installation.....................................................................................6 <br />Section 3 <br />Table 1.3.1 Wattage Requirements for Electric Heating Collars....................................................................7 <br />Table1.3.2 Extension Cord Length...............................................................................................................7 <br />Section 6 <br />Table 1.6.1 Recommended Minimum Burial Depths..................................................................................10 <br />Table1.6.2 Adhesive Kit Data....................................................................................................................12 <br />Table 1.6.3 Adhesive Cure Times When Using Electric Heating Collars.....................................................17 <br />Section 8 <br />Table 1.8.1 Make -Up Dimensions (Wet)......................................................................................................24 <br />PART TWO: <br />Section 2 <br />Table 2.2.1 Determining Length of Containment Pipe.............................................„_................................27 <br />Table 2.2.2 Bolt Information <br />Section 3 <br />Table 2.3.1 Containment Crossover Information.........................................................................................29 <br />Table 2.3.2 Pipe Separation Distances........................................................................................................29 <br />Section 4 <br />Table 2.4.1 Termination Fitting Connections..............................................................................................31 <br />Section 7 <br />Table 2.7.1 No. of Containment Fitting Bonds Per Kit ............................... .....,_..........._...............................34 <br />PART THREE: <br />Section 1 <br />Table 3.1.1 Sizing for Telescoping Pipe Systems.........................................................................................39 <br />Table 3.1.2 Determining Length of Containment Pipe................................................................................40 <br />2 <br />