My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 12:38:04 PM
Creation date
6/23/2020 6:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• �. <br />CONTAINMENT/SHUTDOWN SYSTEM <br />s B-200'DISPENSER <br />RETROFIT AND NEW INSTALLATION INSTRUCTIONS <br />• The Bravo B-200 is compatible with all existing primary and secondary piping systems. <br />RAVD.•s • <br />RETRoF T INST.4LLAMN: NOT factory installed. <br />• ® " Disconnect all electricity. Remove Above and below the base of the B-200 box, connect all electrical and vapor <br />• <br />existing dispenser(s). • recovery lines to the bulkhead fittings and/or factory installed couplings. <br />• nMeasure length and width of the Connect any U.L. approved flex connector on to the bottom of the product -line <br />. Bravo B-200 containment box. (See • coupling. Rigid fittings can be used for primary and secondary line connections, if <br />t ' Page 4, Diagram 4A.) desired. <br />Measure existing dispenser opening SECONDARY CONPAM. IE1T: Install flexible hose over primary flex line and <br />• . and cut concrete to fit Bravo box • secure the B-18 fitting and the secondary pipe with a stainless steel clamp. Rigid <br />•° ® bottom. Place Bravo box in the opening. piping can also be used. (Refer to the secondary piping system installation instructions <br />(Refer to Page 4 - retrofit instructions.) on Page 7, Diagram 7A.) <br />• <br />• <br />NEw INSTALLA170N - <br />.Secure box inside the center of the Water -leak test ONLY FIELD -INSTALLED penetration fittings. To test for leaks in <br />• 8openetrations made in the field, fill the base of the box with one -inch of water <br />' <br />f " island to prevent shifting during the above the penetrations. After a few minutes make a visual inspection for leaks under - <br />pouring of the concrete. (Refer to Page 4 <br />• ®. ® neath the box. If there are no leaks, remove the water with a Bravo siphon pump. <br />- <br />- new installations.) Anchor the dispenser to the Bravo box. Anchoring nuts are installed per manufac- <br />• tuner's specifications. Connect the telescopic shear valve to the dispenser inlet pip- <br />®• BoTH INSTALLATIONS: ing. Continue with installation instructions on Page 3. Connect electrical and vapor <br />4# <br />For field installation of electrical lines to the dispenser. <br />• • .and vapor recovery, penetration <br />holes must be cut to accommodate the 1 Seal all field penetrations. The factory -installed conduit penetration should be <br />• correct Bravo bulkhead fittings. Mark on .l • sealed in between the annular space of the conduit and the metal tube with <br />.. the bottom of the box where electrical Chico V or any other equivalent U.L. approved sealing compound. <br />• <br />;* and vapor recovery lines should go and <br />cut holes to accommodate them. (Hole Clear away all debris (pea gravel, dirt, etc.) from the dispenser pan and float <br />• perforation sizes are noted on the side of • box. Assure the float chain tension is properly adjusted and connected to the <br />® the B-200 box.) Available sizes for Bravo shear valve and float arm. Manually test the float system with the valve in the open <br />® <br />vapor recovery fittings: 1/2', 3/4", 1 ", 1 - <br />position by gently raising the float tubing up approximately 1/4 to 1/2". (Refer to <br />• _ <br />• 1/2"(see page 7 for bulkhead fittings). Page 3 - Diagram 3-A .) This action should close the shear valve. If liquid test was per - <br />For the electrical use MYE No: •4 (1-1/4" formed, drain the float reservoir through the float tubing by using a Bravo siphon <br />• •. ST) and MYE No. S (1-1/2" ST). Next, pump. <br />secure the bulkhead fittings to the bot- PLEASE NOTE: The amount of fluid needed to activate the shear valve trigger is <br />tom of the containment box. (Refer to dependent upon the chain tension. <br />• page 7, A -B.) <br />120 Reset the shear valve trip mechanism. <br />' PLEASE NOTE: Contractor must per- <br />• • form a water -leak test (described in Step RECOMMENDATION: To save on labor and time in removing debris, cover the B-200 <br />8) if electrical and vapor recovery are box with cardboard, plywood or heavy plastic during installation. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.