My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 12:38:04 PM
Creation date
6/23/2020 6:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X <br />DISPENSER <br />BASE OPEN <br />PDS ION <br />1" <br />0 <br />1 <br />E TEST POINT 3 <br />Z <br />TUBING" <br />B 0 O <br />i I <br />FLOAP, CGP SEAL IS FACTORY TESTED - <br />DO NOT REMOVE IT <br />(consult manufacturer <br />before loosening this nut) <br />Diagram 3-A <br />e <br />• <br />When the B-200 box is in position on the island and the dispenser is in place, the dispenser or pump inlet should be plumb with <br />• the impact valve. Determine dimension "X" (Diagram 3A) and connect the shear valve and union with a nipple. <br />2The shear valve must be adjusted vertically by loosening the nets on the support bracket holding the impact valve to the dis- <br />penser pan bottom. Loosen the two nuts at the "U" bolt (Diagram 3A, No. 1), and the two nuts at the pan bottom (Diagram 3A, • <br />No. 2). Then loosen the primary to secondary sealing nut (Diagram 3A; No. 3) using a chain wrench or other applicable tool. Now the ' <br />entire impact valve assembly is free to move up and down approximately 1". . <br />After the dispenser riser pipe is connected to the impact valve, proceed in the following order: <br />•. <br />13 <br />A. Tightly secure the sealing nut (Diagram 3A, No. 3) taking care not to over -tighten the upper nut. •. <br />B. Tighten the two "U" clamp nuts (Diagram 3A, No. 1). <br />C. Tighten the two nuts securing the pan. (Diagram 3A, No. 2). <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.