Laserfiche WebLink
C. Optional Fill Tubes <br />3. Sizes Standard Other Sizes <br />1. Fill rubes shall be FRP or contractor supplied and <br />Fill 4" <br />installed aluminum. Locations are shown on <br />Gauge 4" <br />drawings. <br />2. FRP tubes shall be 4" diameter, with a 6"x 4" <br />Inlet 4" <br />double -tapped reducer bushing, and include a 6" <br />Outlet 4" <br />NPT fitting on the tank. FRP tubes can be installed <br />Vent 4" <br />in manway cover or tank shell wall. Aluminum <br />tubes (contractor supplied) shall be 4" in diameter <br />Extra 4" <br />and fit directly into a 4" NPT fitting. Tubes shall ter- <br />4. Strength — NPT fittings shall withstand a minimum <br />minate a minimum of 4" from the bottom of tank. <br />of 150 foot-pounds of torque and 1,000 foot - <br />D. Gauge Plates — Gauge plates shall be installed under <br />pounds of bending, both with a 2:1 safety factor. <br />each service fitting and manway opening. 12,ct2�x0/4= 4_4M • mt,t H. <br />Monitor fittings—Each monitor fitting shall consist of a <br />E. Heating Coils W/ <br />4" NPT fitting on the secondary tank. <br />1. Optional heating coils shall be installed in a <br />separate 22" manway and shall be the standard <br />item supplied by tank manufacturer. <br />2. Location is shown in Dimensional Data on pages <br />7-9. <br />F. Optional Ladders — Ladders shall be the standard <br />ladder as supplied by tank manufacturer (aluminum, <br />carbon steel or fiberglass). <br />G. NPT Threaded Fittings <br />1. All threaded fittings shall be a material of construc- <br />tion consistent with the requirements of the U.L. <br />label. <br />2. All standard threaded fittings shall be half couplings <br />and shall be 4" in diameter. Reducers are to be used <br />for smaller sizes where shown and provided by <br />contractor. <br />11, r a <br />rlio <br />Part III: Execution <br />3.01 Installation <br />Contractor shall be trained by the tank manufacturer, <br />the state or other approved agency. <br />3.02 Testing <br />Tanks shall be installed and tested according to current <br />double wall installation instructions provided with the <br />tank. (Refer to current publication and include as part of <br />specification.) <br />Part IV: Warranty <br />4.01 Warranty shall be manufacturer's current <br />standard warranty. — <br />Petroleum or Alcohol Fuels Storage for Double Wall ' > 4) Will meet Xerxes -published specifications, and will be free from <br />r. Underground Petroleum Storage Tank_ With Resin material defects in materials and workmanship for a period of one (1) , <br />Specified For Expanded Fuels year lowing date of original deliveryby Xerxes <br />- m ` _ I�ersankew) location and iis to be s <br />in ended for activfrom an instale service at thove e new goal <br />Xerxes Corporation` warrants that'Xerxes underground storage tanks are toca <br />U.L listed and if used in accordance with Xerxes specifications and tion, the tank(s) must be recertified by Xerxes in order to maintain the <br />installed according to Xerxes published installation instructions and all ' <br />warranty as originally extended. <br />applicable laws and regulations _: ¢ Xerxes' liability under this warranty shall be limited to, at Xerxes' option, <br />1 Will not fail fora ' (a) repair of the defective tank (b) delivery of a replacement tank to the <br />period of thirty (30) years from date of ongmal pur point of original delivery, or (c) refund of the original purchaseprice. A <br />chase due to external corrosion.. 9 P p <br />• claimant must give Xerxes the opportunity; to observe and inspect the <br />2)'Will not fail for a period of thirty (30) years from date of original pur .r„ V ,, tank prior to removal from the ground or,, the claim will. be barred.. Ali <br />chase due to internal corrosion, provided the tank is, used solely , j * claims must be made in writing within one year. after tank failure or be <br />"with or without tank water bottoms, for the following products _ forayer barred: ` r4 ;;> ' •�4XV, r <br />' :.: C •a"'w. 'i:.'. .X•y,.:"+ ^z tiro. r .. n �Yyai, �u^<. ..# �'Q11 :. ,. <br />F;a Gasoline;gasohol(9046gasoline/ 10% ethanol mixture�`�®:5�46 THE FOREGOING WARRANTY CONSTITUTES XERXES' EXCLUSIVE <br />e a <br />t gasolinnd 9.5% Oxinol-50* (4.75% methanol and 4.7596 ''OBuGA- 10N AND XERXES MAKES NO WARRANTY OR REPRESEN <br />GTBA mixture); Dupont EPA waiver (gasoline with 546 methanol : TATION, EXPRESS OR IMPLIED, WIT- RESPECT TO THE TANK OR <br />" and a minimum of 2.546 cosoivent —the blend may contain a ANY SERVICE, ADVICE, OR CONSULTATION, IF ANY, ' FURNISHED <br />maximum concentration of up to 3.7 weight percent oxygen in TO CUSTOMER BY XERXES OR ITS REPRESENTATIVES, WHETHER <br />the final fuel); MTBE (methyl tertiary butyl ether - gasoline with " AS TO MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, <br />y: up to 2096, by volume, of MTBE; gasoline/water/ethanol or OR OTHERWISE. THE REMEDIES SET FORTH IN THE ABOVE WAR - <br />methanol blend motor fuels including 100% ethanol or rh6thanol "; RANTY ARE THE ONLY REMEDIES AVAILABLE TO ANY PERSON <br />or M85 (85% methanol) at ambient temperatures; jet fu&l: avtias �a FOR BREACH OF THE WARRANTY OR FOR BREACH OF ANY <br />kerosene; diesel fuel; new or used motor oil, or used for fuel oil "OTHER COVENANT, DUN, OR .OBLIGATION ON THE PART OF <br />at temperatures not to exceed 150° F. rd P XERXES HEREUNDER. XERXES SHALL` HAVE NO LIABILITY FOR <br />x, ' pur `<" INCIDENTAL„ CONSEOUENTIAL OR PUNITIVE DAMAGES OF ANY <br />3) Will not fail for a period of thirty (30) years from date o of originall pur �DESCRIPTION, WHETHER ANY SUCH CLAIM BE BASED UPON <br />- chase due to structural failure (defined as breaking or collapse) pro - WARRANTY, CONTRACT, NEGLIGENCE, STRICT LIABILITY OR <br />vided the installation is performed and validated by a qualified instal OTHER TORT, OR OTHERWISE. - <br />lation contractor, installed in the United States, and the tank is;used r <br />as stated above. "TM Arco Chemical Co. Effective 5/15/93 <br />19 <br />