Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(d)(1), must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#125 <br /> 1580 West Main Street <br /> Ripon, California 95366 <br /> The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br /> one (1) 8,000 gallon double wall fiberglass, dry interstitial, underground storage tanks serving <br /> two (2) double sided multi-product dispensers (MPDs). Product lines are double wall fiberglass. <br /> A. Each tank and product line is monitored continuously by probes within the tank annular <br /> space and turbine sump,respectively. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root. Leak conditions trigger visual and audible alarms located on the monitoring <br /> system control panel. Turbine shutdown will occur if either power is lost to the control <br /> panel or turbine sump probe(s) sense leak conditions. <br /> C. The monitor control panel is located near the checkout counter. The monitor is placed <br /> in test mode daily to check alarm function. Results are recorded on a "Daily Monitoring <br /> System Inspection Log". <br /> D. Monitoring is the responsibility of C. or J. Kandhola, Franchisees, or their designated <br /> duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br /> Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Written Response Plan. <br /> F. The monitoring panel and interstitial probes are checked and recertified annually. <br /> Preventive maintenance is scheduled annually in conjunction with recertification. <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel. <br /> r <br />