My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation 3416; <br />"I <br />Attestation No. P 3417 <br />e� Michael Buttess <br />K. C. Bruce <br />Walton Engineering Inc. <br />e r <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />n <br />By: Tom Spindle On: 9/26/2006 <br />By: Tom Spindle On: 9/26/2006 <br />Exp Date: 9/26/2008 <br />In: Exp Date: 9/26/2008 <br />AN <br />{ <br />; <br />In: <br />- i <br />- <br />Compkam otthis training aourm Oces not aeate a warranty agualanty by aowofy4r insb0abai <br />Corrialletwn ofthis trdrning course dons not create a warranty orguaranty by OPWofyow rnstellabon <br />and/armaintenance ofnozdeS, vapwremverysystens and EVR PHASEI system This traning <br />I -` <br />and/amairtfenance.cfnozdes, vaAorrecvvelysWensand E� SEI•sysYenx Th6 t!aining. <br />course dbenot elirrdnate the need to strictly adhere to manufaclorarinsbvchbra' amiprdcedures when <br />course dont not eiirrdnate.the. need to strkt/yad/ere andproadurw when <br />insta0ing and manbining:n=L--. taper recovery .systems and EVR PH4ZI Systems. A# nozzles. <br />insTauinga�maintainirg doaM�va v�Ysys�ms and EVR PHASEISysMms. Altnoales, <br />vapor reCovaysysterrtsand EVR PHASE.rSystems most be Installed and maintain in oro adance xdth <br />- — <br />vapor rerovery systems ale EMPHASEISysterns moat be instaAed and nuintained in accordance with <br />- <br />- <br />marndacliner <br />1 Attestation No. P 3414 <br />C)l P <br />,- Luther Shaw <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />; By: Tom Spindle On: 9/26/2006 <br />I In: Exp Date: 9/26/2008 <br />Corrrpletron ofths training murse does not ovate a warrantyorguawnty byOPW of your rnsbllabon <br />and/ormaintmance cfr oc / , vapor remverysysterns and EVR PHASEIsystem ns training <br />coms'e ace; not eliminate the reed to striatyadhae to manidwaviernubvd ons and procedures whin <br />i rnstamgatdmaintarningnaaftLeporremveysWtemsardEWPHAiFtSWhws. Allnoales <br />vaporremverysr,ow aid EVR:P%LLSEI SYsferru musfbe irutatk�d and mainfairned it arradarxe tlr <br />manubdurer rostructiorsarrd procedures. <br />-� Attestation No. P 3412 <br />Mauricio Miranda <br />l Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: • Tom Spindle <br />On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Completion ofthis barnmg course does not create a warranty orguaanty by OPW of your kstallate:-. <br />and/ormairnteuance ofoon/es; vaporrecoveysysters and M PHASEIsystem Thisoakhig - <br />coase does"eumnatetbe rvd to stritttyadttete to manufacturer insbva/ons and procedureswhen <br />installing abemainfaining noa/e$r vapor Am7v&ysystems and EVR PHASEISysYems. Alt nroa/es; <br />vapor recoverysystemtand EVR PHA.SEI Systems must be instalkd and maintained in aawdanrce with <br />manufacwrer instructions and procedures. <br />Attestation No. P 3410 <br />■�,.. Richard Walton <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />'i <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />" I <br />Completion ofthrs barerng course does not create a warranty orguaranty by DPW of your irutallabon <br />and/ormaintenante ofr=kS, vapwremverysystem and EPR PHASEI systemsfiis training <br />course does not elinunate the need to strictly adhere to manufacturer insbuctions and procedures when <br />and EVR PHA.SEI S Al/noales, <br />rnsYaHlrg and mainbrnlrra n EW vapor systai musts {•stems• 1 <br />!. vapor recovefysystems and EVR' PHASEf 3Ystemrmv#'be irsbNed and marnbirred in accordance with . <br />manufacturer in#mGHons and procedures <br />Attestation No. P 3432 <br />'p .�,... _ Michel Lawrence <br />` `• Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Completion ofths trainng course does not aeate a warranty or gua2nty by OPW of your insW&Wn <br />and/ormaintmaice ofna&es vaporrecoverysysterns abe EVR PHASElsystems• Thustranmg <br />course does not elrmrnate the oto s&xt*adlwe to manufacturer rrstructorsand procedures whin <br />insfaprng and narntainirg nda/es;, WormwveysysAms and EVR PHASFISysbrs. Allnam&!s. . <br />vapor remveysy5tems abe EVR PHASEI Systerrs lnt&be installed and rr wiaioed in accordance wrth <br />manufaaure, inm%rtons and procedures. <br />w' Attestation No. P 3415 <br />Kevin Graf <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Comp&= otthis training course does not awle a warranty orguarenty by pPW of your iasta/labon <br />aM/ormairnenanre naal� vapor vorysYs S and EVR PHASEI systs"N This trawrring <br />course danot efmunate Me need m sbrcttyadhere to manuWtUfarinsbvctiom ardproredurs when <br />m <br />rnsblfirg ardrnamtainoW nozdes; vaporrecoveysystems dndEVR PHASPISystem All nozofwe� <br />vaporremverysystww aMEVR. PHASErSysAvm mast be insbaed and maintained in accordallm wth <br />manufacbrrer irstrucbom and prowdures. <br />Attestation No. P 3413 <br />Larry L LeDuff <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />N <br />Completion ofths vainrng course does not ovate a warranty orguananty by OPWof your ink//abort <br />and/armau�rranceofr� vaporremvErysystemsard EVR PHASE7.$ 7hts training <br />course dons not e/rrninatethie need tosbtd/radhere to manuf-dunerrrnsbutYrons abe procedures when q <br />l j instahgand rwh7tainirg nozzle;,lecoverY systems and EVR PHASEI Systems A//nan/es, <br />vaporreCoverysystenns aid'EVR PHASEI.$stens must be insfaW and maintained in accordance with <br />numeact,1W nstructioos and procedures. - <br />.► Attestation No. P 3411 <br />C), F31Ryan Green <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Compiefion ofthe. barnrng Course does not ovale a warrmly orguaranty by OPW of yarn uutallamn <br />and/ormalntmance ofnrozdes valmrtewwrysystensand EVR PHASEIsystem€ Tblstrinam <br />. course does nd effflyoate Hue rued tostra:W adhwe to manufacturer ins&UdWns and PfVWdrnea when <br />rrrsmlliig and mainlainirg nozzles; vapor reroverys'Ystwns and EVR PHA.Zrsystsms. Aff nou/es; <br />vapo`reawarysys(wrs and EW PHASEI Systems mast be installed and maintainedin accordance with <br />` manufacturer instructions and procedures. <br />Attestation No. P 3433 <br />Bruce Stewart <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Canpleben ofthrs training course does not ovate a warranly orguaranty by OPW of your veta/later <br />ardlornonaenanceofnozzfes vaparecosenysYslenuand EVRMM-1E1syaems: Thistranfng <br />course ars not ekinkute the creed to slrkW adhere to manufattuny rnstru dims and proadones when <br />usbding andmamarwV noz*s, vapor recoverysysterts ale EM PHASEISystems. All n away <br />vapor remverysyslerrs and EVR PHA -EI Systems must be installed ad rrnai»taned in aaddance noun <br />manufacwrer instvcbbrs andprocedurns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.