Laserfiche WebLink
Attestation No. P 3429 <br />ate- Scott Jessiman0 <br />a' <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc { <br />I <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Comp/etionofthis bailing cnwse dos not aeate a warranty or guaranty by oPW of yw, u stayalion <br />and/oramintetranceofmzdi!F, vaporremverysystems and SIR PHASEIsystems 7hahainmg <br />course: does nrot'el/m/nale um need 'toshxW adhere: to rrenWaaurer ustrudiom and piocedws when <br />instatiing�an0 mNntNWng.nou/es�:VA" reeeveiysystems and EW PHASEISystem. A#nomhs� <br />vapor reave ysystem and EVR PHA SEI Systerm must be instahed and maintained in accordance wrath <br />mameac ure- astruntons andprox&fes. <br />Attestation No. P 3431 <br />James Day <br />Walton. Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />i <br />By: Tom Spindle On: 9/26/2006 <br />r <br />1 In: Exp Date: 9/26/2008 <br />Completion ofthis tra/ning nurse does not aeafe a waaanfy or-OuarantY by OPW of your i2daliation <br />and/ormaintenance ofnazaes, vapornecoverysystems and EVR PWSEI spurs. 7his training <br />i course does not aftnate the newd io strw6y adher 10:,wnufadurerinsbucbom ardPowduns when <br />ins6Rirg arrdnradrtaatiig noa/es, vapu AwoveryskshmsandEVRPHASEISys&wu- Ap0offie5� <br />vapor 2mverysystetm and EVR PHASE( Sysiem must be Instated and maimairnd x a¢ordance cath <br />manufacturer /ns&ucbbns and procedure. <br />Attestation No. P 3422 <br />Juan Delgabo <br />Walton Engineering Inc.' <br />G <br />A Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />i In: Exp Date: 9/26/2008 <br />Comp/etldn. ofthisLaihing_murse. does not create a war miy a9uaranty by oPW ofpmr ifksta//anon <br />abe/ar ma/rNenarce ofndgles,. vaP-recd erysystems and EVR PHASEisystrrns. This traineW <br />r j course does not eliminate theneed-to sbictiyadh&e to manufacturer isbuntiom and procedures when <br />installing andiwiptain/ng nozzles, vapor recovery system and EVR PHA -IF ISp-teem. A#noz*s, <br />I i vapor recovery system and EVR PHASE Systems must be installed and norma/rad in accordance with <br />..... <br />_ Attestation No. P 3430 <br />•�-r Scott Melvin <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Completion ofthis training course does not create a warranty or guaranty by opW of your tnga/lation <br />and/ormalntenance ofrwzdes, vapornnowjyysystem and EVR PHASEIWSAw., 77csbaimv <br />course does rrd dirrorrate the need io st cwadhere to manufacturer irsbtrtf/ors and Procedure when <br />/nstal//ng and ma/rata/nmg n0ZMM vapor rmOveryS),StMn and EVR Pif (S)stems A// nozzles; <br />,i vapor nxvvdysysterrs and EW PHASE(Systems must be insW/led and maintained in adadance w11 <br />iwnwwwrff instructions and pnocedunes <br />