My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No. P 3429 <br />ate- Scott Jessiman0 <br />a' <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc { <br />I <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Comp/etionofthis bailing cnwse dos not aeate a warranty or guaranty by oPW of yw, u stayalion <br />and/oramintetranceofmzdi!F, vaporremverysystems and SIR PHASEIsystems 7hahainmg <br />course: does nrot'el/m/nale um need 'toshxW adhere: to rrenWaaurer ustrudiom and piocedws when <br />instatiing�an0 mNntNWng.nou/es�:VA" reeeveiysystems and EW PHASEISystem. A#nomhs� <br />vapor reave ysystem and EVR PHA SEI Systerm must be instahed and maintained in accordance wrath <br />mameac ure- astruntons andprox&fes. <br />Attestation No. P 3431 <br />James Day <br />Walton. Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />i <br />By: Tom Spindle On: 9/26/2006 <br />r <br />1 In: Exp Date: 9/26/2008 <br />Completion ofthis tra/ning nurse does not aeafe a waaanfy or-OuarantY by OPW of your i2daliation <br />and/ormaintenance ofnazaes, vapornecoverysystems and EVR PWSEI spurs. 7his training <br />i course does not aftnate the newd io strw6y adher 10:,wnufadurerinsbucbom ardPowduns when <br />ins6Rirg arrdnradrtaatiig noa/es, vapu AwoveryskshmsandEVRPHASEISys&wu- Ap0offie5� <br />vapor 2mverysystetm and EVR PHASE( Sysiem must be Instated and maimairnd x a¢ordance cath <br />manufacturer /ns&ucbbns and procedure. <br />Attestation No. P 3422 <br />Juan Delgabo <br />Walton Engineering Inc.' <br />G <br />A Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />i In: Exp Date: 9/26/2008 <br />Comp/etldn. ofthisLaihing_murse. does not create a war miy a9uaranty by oPW ofpmr ifksta//anon <br />abe/ar ma/rNenarce ofndgles,. vaP-recd erysystems and EVR PHASEisystrrns. This traineW <br />r j course does not eliminate theneed-to sbictiyadh&e to manufacturer isbuntiom and procedures when <br />installing andiwiptain/ng nozzles, vapor recovery system and EVR PHA -IF ISp-teem. A#noz*s, <br />I i vapor recovery system and EVR PHASE Systems must be installed and norma/rad in accordance with <br />..... <br />_ Attestation No. P 3430 <br />•�-r Scott Melvin <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Completion ofthis training course does not create a warranty or guaranty by opW of your tnga/lation <br />and/ormalntenance ofrwzdes, vapornnowjyysystem and EVR PHASEIWSAw., 77csbaimv <br />course does rrd dirrorrate the need io st cwadhere to manufacturer irsbtrtf/ors and Procedure when <br />/nstal//ng and ma/rata/nmg n0ZMM vapor rmOveryS),StMn and EVR Pif (S)stems A// nozzles; <br />,i vapor nxvvdysysterrs and EW PHASE(Systems must be insW/led and maintained in adadance w11 <br />iwnwwwrff instructions and pnocedunes <br />
The URL can be used to link to this page
Your browser does not support the video tag.