My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:49:45 PM
Creation date
6/23/2020 6:49:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MONITORING SYSTEM CERTIFICATION <br />CERTIFICATION /TEST DATE: June 10, 2015 <br />Al. FACILITY <br />❑ No * <br />Is the audible alarm operational? <br />A2. OWNER <br />❑ No* <br />Name <br />Quik Stop Market #125 <br />❑ No* <br />Name <br />Quik Stop Markets, Inc. <br />Address <br />1580 W. Main Street, Ripon, CA 95366 <br />Address <br />4567 Enterprise Street, Fremont, CA 9453B <br />Phone # <br />510-657-8500 <br />If slams are relayed to a remote monitoring station, is all communications equipment (e.g. modems) <br />Phone # <br />510-657-8500 <br />Contact <br />Roger Batra <br />❑ No, <br />Contact <br />Debbie Markovich <br />ID. RESULTS OF TESTING I SERVICING <br />Make / Model of Monitoring System: Gilbarco EMC SN# 80850111805001 <br />Software Version Installed: 330.01 <br />Complete the following checklist: <br />■ Yes <br />❑ No * <br />Is the audible alarm operational? <br />■ Yes <br />❑ No* <br />Is the visual alarm operational? <br />■ Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />■ Yes <br />❑ No* <br />Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment <br />will not Interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If slams are relayed to a remote monitoring station, is all communications equipment (e.g. modems) <br />■ NIA <br />operational? <br />■ Yes <br />❑ No, <br />For pressurized piping systems, does the turbine automatically shut down If the piping secondary containment <br />❑ N/A <br />monitoring system dotects a leak, falls to operate, or Is electrically disconnected? If yes: which sensors initiate <br />positive shutdown? (check all that appl)l ■ Sump/Trench sensors; ❑ Dispenser Containment Sensors. <br />■ Yes <br />❑ No* <br />Did you confirm positive shut -down due to leaks Ipj sensor failure/disconnection? <br />❑ Yes <br />❑ No * <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />■ N/A <br />mechanical overfill prevention valve Is installed), Is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? _ % <br />❑ Yes * <br />■ No <br />Was any monitoring equipment replaced? If yes, Identify speelfic sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts In Section E, below. <br />■ Yes * <br />❑ No <br />Was any liquid found Inside any secondary containment systems designed as dry systems? <br />(Check all that apply) ■ Product; ■ Water. If yes, describe causes In Section E, below. <br />■ Yes <br />❑ No * <br />Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports, If applicable. <br />■ Yes <br />❑ No * <br />Is a8 monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. COMMENTS <br />Replaced battery on the monitor. <br />Removed liquid from the diesel fill & STP, 87 fill & STP, and UDC 1-2. J11N 14 ?n1,�_— <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.