My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:49:45 PM
Creation date
6/23/2020 6:49:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICATION <br />CERTIFICATION /TEST DATE: June 10, 2015 <br />Al. FACILITY <br />Yes <br />A2. OWNER <br />Name <br />Quik Stop Market #125 <br />❑ <br />Name <br />Quik Stop Markets, Inc. <br />Address <br />1580 W. Main Street, Ripon, CA 95366 <br />❑ <br />Address <br />4567 Enterprise Street, Fremont, CA 94538 <br />Phone # <br />510-657-8500 <br />❑ <br />Phone # <br />510-657-8500 <br />Contact <br />Roger Batra <br />❑ <br />Contact <br />Debbie Markovich <br />No" <br />Were all probes reinstalled property? <br />❑ <br />Yes <br />❑ <br />IF. IN -TANK GAUGING / SIR EQUIPMENT: <br />■ Check this box If tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment Is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No " <br />Has all input wiring been Inspected for proper entry and termination, Including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No • <br />Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />_ <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No" <br />Were all probes reinstalled property? <br />❑ <br />Yes <br />❑ <br />No* <br />_ <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />" In Section H below, describe how and when these deficiencies were or will be corrected. <br />1G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. ' <br />Complete the following checklist: <br />■ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />NIA <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ <br />Yes <br />❑ <br />No' <br />Were all LLD* confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow If It detects a leak? <br />■ Yes <br />❑ No' <br />❑ <br />NIA <br />❑ <br />Yea <br />❑ <br />No' <br />For electronic LLDa, does the turbine automatically shut oft If the LLD detects a leak? <br />■ <br />NIA <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDa, does the turbine automatically shut off If any portion of the monitoring system Is disabled <br />■ <br />NIA <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No " <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />■ <br />NIA <br />or falls a test? _ <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />NIA <br />■ <br />Yes <br />❑ <br />No* <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />JUN 14 2016 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.