Laserfiche WebLink
SW RCB,Ia.-.ua-.i 2002 Pune3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer X Industry Standard <br /> Professional Engineer <br /> f",Other(Spec) <br /> Test Method Used: X Pressure I-,Vacuum f Hydrostatic <br /> Other(Sped/.O <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: .002 <br /> a i EMEMEMOMMEM� -=1- =77 <br /> Piping Run#8? Piping Run# 91 Piping Run# <br /> DIESEL <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLSS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 15, 15' 15' <br /> Product Stored: I-A V GAS "IESEL <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 12:00 PM 12:00 PM 12:OOPM <br /> Initial Reading(Ri): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1:00 PM 1:00 PM I:OOPM <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I HR I HR I HR <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: 0 1 0 0 <br /> Test Result: X Pass 0 Fail I X Pass Fail X Pass 0 Fail Pass U Fail <br /> Comments—(include information on repairs made prior-to testing, and recommended ji)llotv-til)ji)i-.Miled tests) <br />