Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) F_ <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-I. <br /> PLAN TYPE ® L MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 11 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): e <br /> I. FACILITY INFORMATION SAN JOAQUIN COUNTY <br /> FACILITY ID#(Agency Use Only) H;N1I <br /> LT GE A6� ME T <br /> BUSINESS NAME(Same as Facility Name or DBA) UPS Stockton 3 <br /> BUSINESS SITE ADDRESS 1532 North Broadway 03 c�Y Stockton 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVEMAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR i2632,2634.263s 26411 <br /> ..... 1.11.1.... ......... <br /> 490-3a. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-4. <br /> [23 CCR 12632,26341 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hat a k l) <br /> ® I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR 12632,2634] <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root TLS-350 490-7. MODEL#: 0847090-022 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 302 490-10. <br /> .................................(................)....... 1 <br /> ❑ 2.AUTOMATIC TANK GAUGING ATG SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl.[23 CCR 12643 496-I1. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> lei PROGRAMMED TESTS: ❑ a.0.1 h. g.p.h. ❑ c.OTHER(Specify): 490 Is. <br /> ........... . ... ........... ...... ......._... ... ............ _g p 6.0.2. ..._h: ..........1 1 ...........11...... ( P ... ..490-1.. 111.1..1. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23CCR*12646.11 490-20. <br /> .. ......... ....... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR 126451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21. <br /> 1-1-. ..1 .11............ 1 111............... ago z <br /> 2. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR 12643.11 496-.3. <br /> TEST FREQUENCY ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci <br /> 490-24. <br /> .1 ....111... ( P fY). a90 zs <br /> .................................. <br /> ❑ 99.OTHER(Specify): 490-26: <br /> 490-27, <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) at a k all <br /> ) <br /> ® L CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [z3CCR <br /> 361 <br /> 12636] SECONDARY CONTAINMENT IS: ® a.DRY F1b.LIQUID FILLED [3c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER: Veeder Root TLS-350 490-30. MODEL#: 0847090-022 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 491-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ............. ...... <br /> ® 1-11 <br /> 2. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCO26361 <br /> MLLD MANUFA.. ..............C... .TURER_... .....(..S_..).:Va orless 490-37. MODEL#(S): 99LD2000 490-3s. <br /> ................ ....... .........._... .... <br /> ❑ <br /> ...... .....3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCRi26361 .490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [:1a.YES El b.NO 490-44. <br /> ......1111. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> 490-45. <br /> TEST <br /> TEST FREQUENCY: ❑ a.ANNUALLY ® b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46. <br /> ( P Y) 490-47. <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> ago-d�. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-42 <br /> *Allowed for monitoring of unburied etner$.ency.kenerator.fuel piping_only pet.HSC 126281 5(b)(3) <br /> ......._...... ..._.......... ._............... .. 111__1._..1111 ......... 1111. 111.1... 1111... ........ -.......... .. <br /> ............ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR 12636(a)(3)1 490-so. <br /> ........1 1111 1 11 1......... 1..1.......1-1........._.. ..._-......_. 111 1.....:.._... ....1.111. ................................ .......... .. ............... ...... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. .............1. <br /> ._.................... ........._ ......1111.. <br /> ❑ 99.OTHER(Specify) <br /> 490-53. <br /> UPCF UST-D(12/2007)-115 www.unidocs.org <br />