Laserfiche WebLink
a a <br /> UMTFIED PROGRAM CONSOLIDATED FOR3'r <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br /> that apply) <br /> IW'UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> El 1.CONTINUOUS ELECTRONIC MONITORING [] 2.FLOAT AND CHAIN ASSEMBLY 3.ELECTRONIC STAND-ALONE 490-54a. <br /> [-1 4.NO DISPENSERS 171 99.OTHER(Specify) 490-54b. <br /> .......... ...............................................­­­......................................... ................-...................................................-............... -............- ........... <br /> LEAK MONITOR MANUFACTURER:Veeder Root TLS-350490-55. MODEL#:0847090-022490-56. <br /> LEAK SENSOR MANUFACTURER:Veeder Root Stand Alone 490-57. MODEL#(S):001 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. [1 a.YES b.NO 411-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 13 a.YES b.No 490-61. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [] a.YES b.No 491-11. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ID a.YES ❑ b.No 491-61. <br /> .............. <br /> ... ..1-1- 1 .................................................................................. ...............................I..",... ....................­­­­................... ......................I....................................................................................................­­­............................................................................................-..............................- <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL E] 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 171 a.LIQUID F1 b.PRESSURE El c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. [:] a.YES El b,NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR 12644.1] <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY, 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> El a.ALARM LOGS ED b.VISUAL INSPECTION RECORDS E] p.TANK INTEGRITY TESTING RESULTS <br /> 171 d.SIR TESTING RESULTS(and supporting documentation records) El e.TANK GAUGING RESULTS(and supporting documentation records) <br /> EJ f.ATG TESTING RESULTS(and supporting documentation records) E] g.CORROSION PROTECTION 60-DAY LOGS <br /> ❑ h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ED THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> El CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION <br /> ❑ SWRCB PUBLICATION: UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS 490-69g. <br /> ❑ OTHER(Specify): 490-69h. <br /> 490-69i. <br /> This facility has a Designated LIST Operator who has passed the California LIST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The Designated UST Operator will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the LIST systems in a manner consistent with the facility s best management practices. <br /> ➢ The facility employees role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee s role with regard to spills and overfills as specified in the facility s UST Response Plan, <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71, <br /> Note: Designated Operator inspections occurring monthly and include tripping/alarming monitoring system. In order <br /> to preserve alarm history the Designated Operator will print out alarm history/log prior to completing monthly <br /> inspection and will affix to DUSTO. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine LIST monitoring activities and maintenance of LIST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. <br /> .11.11.............-............"..'...........................-............................­­­­ .............._­­..............- 11.............................­­­ - ....................................­­ - ­­­­­­­­ ................................­­­­­­ ............. ­­­................1.1....... .... ........................ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Kasi Montgomery 490-72 TITLE:Plant Engineering Supervisor 490-73. <br /> NAME: Jason Schoon 490-74. TITLE:District Environmental Coordinator 490-75. <br /> The Designated LIST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNERJOPERATOR SIGNATURE <br /> 4kCERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE. 490-77. <br /> REPRESENTING:0 1.Tank Owne'./Opera&/M 2.FaciXy t)wnei/Operatoi 0 3.Authorized Repiesentative of Owner 490-76. <br /> U PCF UST-D(12/2007)-315 �/ L/ www.uiiidocs.org <br />