My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NIFIED PROGRAM CONSOLIDATED FOR� <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a490-546 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY El 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS 099.OTHER(Specify): ------------------------------------------------------i�F35_1------------------------------------------------------------------ <br /> ------- <br /> PANEL-MANUFACTURER:-Veeder-Root------------------------------------------------------------------------ MODEL#:TLS-350 0847090-022 490-56, <br /> LEAK SENSOR MANUFACTURER:Veeder Root MODEL#(S):001 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS F1 a.YES 0 b.NO 4(X-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN Z a.YES El b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. D a.YES 0 b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. 0 a.YES D b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS ®1.SINGLE-WALLED02.DOUBLE-WALLED 490-63 <br /> ---—------- <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: F-1 1.LIQUID El 2.PRESSURE El 3.VACUUM <br /> --- ------------ ----- ----- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARM-S----El-a.-YES----E1_b_._NO------490-646 <br /> - <br /> VII.PERIODIC SYSTEM TESTING <br /> r_1 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65 <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> _ <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SPILL BUCKETS ---------------------------------------------------------------------------------------------------------------------------------------------4-9-0---6-7- <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ❑Alarm logs 490-68a [E Visual Inspection Records 490-68b ❑Tank integrity testing results 490-680 <br /> M SIR testing results(and supporting documentation records). 490-68d Tank gauging results(and supporting documentation records). 490-68e <br /> 0 ATG Testing results(and supporting documentation records).490-69f ❑ Corrosion Protection 60-day logs 490-68g <br /> 0 Equipment maintenance and calibration records. 490-68h <br /> IX TRAINING <br /> 2 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 0 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> Z OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69C <br /> r-1 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> R CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> El STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> El SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> El OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This 1 <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Herman Meyer/Kasi Montgomery 490-72 TITLE Plant Engineering Supervisor <br /> 490-73 <br /> NAME Troy Hanson/Paul Lerma 490-74 TITLE Center Manager <br /> 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of-any-], <br /> conditions that need follow-up action. <br /> X11.OWNER/OPERATOR SIGNATURE <br /> A&I? <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> REPRESENTING'[1 1.Tank Owner/Operator 0 perator ❑3.Authorized Representative of Owner <br /> APPLICANT NAME(print): 490-78 490-79 <br /> APPLICANT TITLE: <br /> Doug Ray Plant Engineering Area Manager <br /> UPCF UST-D(12/2007)3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.