Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN -(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN [1 2.CHANGE OF INFORMATION f 12011 490-1. <br /> PLAN TYPE ® 1.MONITORINGIS IDENTICAL FOR ALL USTs AT THIS FACILITY. SAN 490-2. <br /> (Check one item only) E] 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): VIRON� NTAI <br /> I. FACILITY INFORMATION HEALTH DEPARTMENT <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) UPS Stockton 3 <br /> BUSINESS SITE ADDRESS 1532 North Broadway 103' CITY Stockton 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers instructions,or annually,whichever is more frequent.Such work must be erfonned b ualified personnel.[23 CCR i 2632,2634,2638,2641) <br /> ........... .....q.. - ......... ....-..-.... .....I?........ .. Y q.......... ..P .......... ..... . .. ....... . ...... ......... <br /> MONITORING EQUIPMENT IS SERVICED 490-3a. <br /> Q ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-36. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR 12632,2634] 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hah aek l) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR 12632.26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root TLS-350 490-7. MODEL#: 0847090-022 490-8. <br /> 9. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490- MODEL#(S): 302 490-10. <br /> ............................... <br /> ❑ 2.AUTOMATIC TANK GAUGING ATG SYSTEM USED TO MONITOR SINGLE WALL TAN *.[23 CCRt2643] 490.11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 491-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): a9°-18. <br /> g.p.h. _............._g..p............"................................................................._........�....p..........._Y�.:..... .........avo <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCRI2646.11 490-20. <br /> ....................................................................................................................................... ....................................................................................................................-....................................-.......-....................................................................................................-...._......................................................................................................................... <br /> . <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[_,3 CCR I2645] TESTING PERIOD: ❑ a.36 HOURS E] 4 <br /> b.60 HOURS 4990 <br /> 490-.I. <br /> ..............................................................................-...........................................................................................................................................`.............................................................-..............................................................-................................................................................ . <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR 12643 .1] 490-23. <br /> TEST FREQUENCY: ❑ ANNUALLY 490-24. <br /> .................................._..................'........_Q........................_..........................................._..._....._a......._........._............................................_❑ b.BIENNIALLY ❑ c.OTHER(Specify): ago-_s <br /> ❑ <br /> 99.OTHER(Specify): 490-26. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that <br /> kall <br /> ® L CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [x2636, SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER: Veeder Root TLS-350 490.30. MODEL#: 0847090-022 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 208 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> _.................................................................................................................................................................................................................................. <br /> ® 2.MECHANICAL L[NE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCRI2636I <br /> MLLD MANUFACTURER(S):Va orleS8 490.37. MODEL#(S): 99LD2000 490-38. <br /> ..........................................................................................-....................................... ...........................-............................... ......... <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCRa126361 490-39. <br /> ELLD MANUFACTURER(S): 490-40, MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ......................................................................................................................................................................................-..........................................-...............................................................................-............ . ..... . <br /> ........................................................................................................................................................................................... <br /> 4.PIPE INTEGRITY TESTING. <br /> 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY 490-46. <br /> Q ® b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49047. <br /> .................................................................................... <br /> ❑ 5.VISUAL PIPE MONITORING. 490-4a. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for monitoring of unburied emergency generator fuel piping only per HSC 125281.5(b)(3) <br /> ......................................................................................................................................................................................................................................................................................................................................................................................................................_......................................... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR I2636(a)(3)] 490-50. <br /> -..............................................._............................-..............................................................................................................................................................................._..............................................................._................................._..................................................................................................................._..............._.............................. <br /> 490-51...................... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br /> ......................_.....................................-............................-.............._................................... __...._....._.........._.............._........................................................................................._..............................................................-...................._..............__..............._.................................................................. <br /> ..................... <br /> 490-5_. <br /> ❑ 99.OTHER(Specify) ago-53. <br />